Super Orchard

Chapter 130 Planning the Fence

Chapter 130 Planning the Fence
While Shen Yangguang was lying on the grass and thinking wildly, Zhang Xueyou strode over and took a blueprint and said, "Boss, the specific monitoring installation location has been planned."

Shen Yangguang took it over and looked at it, and saw densely drawn lines on the blueprint, which made his head hurt from looking at it, and said: "You can see for yourself that there is no problem."

Zhang Xueyou agreed, but did not leave after receiving the drawings. Shen Yangguang asked doubtfully, "Director Zhang, is there anything else?"

Zhang Xueyou, who has always been serious, suddenly felt a little embarrassed, and said falteringly: "Now our orchard is getting bigger and bigger, and only a few people from our security department take turns to patrol, although we can see it, but more or less Still a little overwhelmed.”

Shen Yangguang thought that Zhang Xueyou had fewer employees in the security department and was too busy at ordinary times, so he said, "How many people do you expect to be short? I can consider adding a few more to your department."

Zhang Xueyou waved his hands again and again: "I don't mean that, I mean, didn't the boss want to build a fence around the orchard before? If there is a fence, the work of our security department will be easier. Monitoring, then it will be more secure for the safety of the orchard.”

Shen Yangguang slapped his head in frustration, probably because there had been no theft during this period of time, and he actually forgot about it.

In the past, Shen Yangguang didn't have enough money to build the fence, but now it's different. After building the office building, there will be more than 3000 million yuan left. Isn't it trivial to build a fence to enclose the orchard?
Thinking of this, Shen Yangguang took Zhang Xueyou to the small ridge in the north. Since this place is higher than the south ridge, standing here, you can have a panoramic view of the orchards in the valley, including the ridges on both sides. .

"The mountain forest I contracted at that time included not only the valley in the middle, but also the two slopes of the ridges on both sides."

After thinking about the specific data, Shen Yangguang went on to say: "The width of the valley is 300 meters, the slopes on each side of the south ridge are about 150 meters, and the two sides are 300 meters in total. The north ridge is slightly wider, and the two sides add up to 400 meters. meters, so the overall width is one kilometer, and the length from east to west is about six kilometers, what scale do you think the wall is suitable for building?"

As Zhang Xueyou often thought about building the fence, Zhang Xueyou said directly without thinking: "The fence is built directly under the slopes of the ridges on both sides, enclosing all the land contracted by the boss, which is one kilometer wide and six kilometers long. Fourteen kilometers long."

Shen Yangguang smiled wryly to himself, thinking that what you said was easy, but such a long fence is full of white money! He said: "I originally planned to build the fences on both sides on the ridges on both sides. No, the width will be reduced by one-third, and for the other length, I plan to build half of it first, and then expand it after this half of the valley is full of fruits."

Zhang Xueyou insisted: "Boss, let's not talk about the length issue, but if the walls on both sides are only built on the ridge, then the hillsides on both sides will be exposed to the outside? Although everyone is in a panic now, it's not guaranteed." When will it be developed and utilized in the future, so much land is also land!"

Seeing the distressed appearance of the other party, Shen Yangguang couldn't help wondering whether he was so rich and powerful that he turned a blind eye to the land on both sides of the hillside. Then he thought that according to Zhang Xueyou's statement, it only increased the width by one-third First, the width at both ends adds up to about 700 meters, which is not much money.

Thinking of this, Shen Yangguang nodded and said: "Okay, then, as you said, the walls on both sides are built on the outermost edge at the foot of the hillside, enclosing all our land!"

Although the surrounding hillsides on both sides may not be used in recent years, it does not mean that they will not be used in the future. Since the width has also increased, Shen Yangguang simply increased the length in one step, directly following what Zhang Xueyou said. In that way, build a fourteen-kilometer-long wall to enclose the entire mountain forest.

As soon as he thought about it, Shen Guangguang found Zeng Guang on the construction site of the office building, told him about his idea of ​​building the fence, and finally asked, "How much is the total cost of this project?"

Zeng Guang was very familiar with this job, so he asked back: "In this way, what kind of wall do you build and how high is the wall?"

"It's just an ordinary masonry and cement wall, with a height of about three meters."

Zeng Guang calculated the cost after a little thought, and said: "The cost of one square meter of this kind of wall is more than 100 yuan and nearly 200 yuan. Including the foundation, the total cost is about 4000 million.”

800 million was completely within Shen Yangguang's tolerance, so it was decided on the spot.

There was 100 million yuan left in the account of Jinquan Orchard before. After going out to pay last month's salary and the annual contracted forestry fee of more than 60 yuan, there was still 4000 million yuan left.

Now I have paid another 500 million yuan for the initial construction cost of the office building, leaving 500 million yuan left.

As for the 800 million yuan project fee for the construction of the wall, Shen Yangguang also used the method of installment payment, paying 400 million yuan in advance, and the remaining 400 million yuan will be paid next year. As a result, the account of Jinquan Orchard Only 100 million yuan remained.

So much money seems like a lot, but Shen Yang still has a lot to spend, so he doesn't dare to spend it randomly.

For example, the solar power generation equipment in the fruit garden, the newly built second-phase power generation project at that time could only meet the electricity demand after the durian greenhouse was completed. As for the electricity demand of the jackfruit greenhouse built this spring, it could not be regarded as completely meeting the electricity demand.

This is mainly because it is early summer, and there is no need for heating in the greenhouse, so a lot of electric energy is saved. However, after autumn, with the characteristics of tropical fruits such as durian and jackfruit, it is necessary to turn on a full set of heating in the greenhouse. system, the existing power will definitely not be enough by then, and the third phase of solar power panels will be laid again.

After the project of building the fence was confirmed, since Zeng Guang's engineering team was building the office building at this time, it was impossible to start the construction of the fence at the same time, but the pre-measurement preparation work could be carried out in advance.

Shen Yangguang went home and dug out the original contract. He took the staff, Zeng Guang and the surveyors of their company and spent nearly two days walking the [-] kilometers back and forth two or three times before finally deciding on the contract. The specific scope of the mountain forest contracted by himself.

Next, Zeng Guang and their staff began to measure at fixed points to determine the location of the foundation of the wall. This project is a little slower, so although the approximate position has been determined, the fixed-point measurement must be accurate. In the case of no loss or omission, it is also necessary to ensure that no land outside the contracted area is occupied.

Although it would be fine even if he took up a little more land, if he was sued by someone with a heart, let alone how to punish him, just tearing down the fence and rebuilding it would be a sky-high price, and Shen Yangguang didn't want to go through such a hassle.

Immediately afterwards, a small excavator drove into the orchard, went directly to the foot of the hill outside, and began to dig the foundation. Since the requirements for the foundation of the fence are not as high as those of the office building, this small excavator is fully capable.

 Thanks to Shenshan Xiaoshu66 for the reward!Thank you for your subscription support!Thank you for your monthly pass!Thanks everyone for the votes!Thank you for your support!

  
 
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like