The Pastoral Life of a Cultivation Master

Chapter 53 Construction Planning

Chapter 53 Construction Planning
After Chen Mo finished eating, he wanted to help his mother clean up the dishes, but she was pushed out of the kitchen. In her words, don't bother her. After a few dishes were cleaned up at once, Chen Mo came in and made her clean up much slower. .

Well, my mother's kindness will be lived up to, watching my dad watching TV inside, he goes straight back to his house.

The night was silent, and it was still spent practicing.Here, the practice of the talisman still cannot be done, because he is afraid that there may be an accident in the process of making the talisman, and there may be a loud noise.This is also explained in the jade talisman of the transmission, and the talisman must be made in a secluded and separate place, including the formation foundation of the formation method!
Therefore, he can only contact calligraphy first and lay the foundation for drawing talismans.In addition, I bought a few carving knives and learned jade carving according to the professor on the jade talisman. I have been practicing for several days.

The next day, Chen Mo didn't go anywhere, just watched Chen Ming's workers do the finishing work at home.The room was just tiled and painted.He also has no intention of drastically changing the structure of the family. The main reason is that after his house is repaired, he will let his parents live where he is, and then the house will be demolished and rebuilt into a building.So now it's just laying the ground and building the bath room, and the rest will be discussed later.

I didn't go out today because Chen Ming contacted the biogas construction company in the county. They wanted to send someone to conduct an actual survey and talk to Chen Mo to build the entire biogas tank according to his requirements.

Chen Mo was not asked to wait. At about [-]:[-] in the morning, two people from the biogas digester company arrived at the old house of Chen Mo's house, and they were all men.

Chen Mo, Chen Ming and the staff of the biogas digester company discussed the construction plan with each other, and Chen Mo asked them to tell them.

The first is to emphasize safety. All equipment and facilities must be safe.Construction should be carried out in accordance with double insurance measures.

The second is durability. Ordinary biogas digesters can be used for more than ten years, but biogas digesters at home must meet the 50-year use standard.

The third is quality. Except for small accessories, large accessories must reach the service life.

The fourth is the construction standard, which must be of high standard and high quality.

The fifth is the dual-pond mode, which must ensure the uninterrupted biogas. In order to ensure that your daily use can be fully satisfied, then the dual-pond is necessary. Although the biogas tank will have biogas available after feeding, but in terms of use, the double-pond It is the best, but the cost is stuck.In addition, there are requirements for the volume of the gas pool and so on.

After listening to Chen Mo's request, the two on-site staff of the biogas digester company could only nod their heads. The requirements are not high, and all of them can be done. However, the construction funds are very high, and it will cost more than 10,000 yuan. Two people They are all secretly complaining in their hearts, it is really an upstart who is not short of money!But he was also very envious, looking at Chen Mo, he was not very big and said, why is he so rich, alas!Life!
"Do you still have any questions? If there are any, ask them now." Chen Mo asked.

"Mr. Chen, according to your requirements, such a biogas digester has been constructed. If it is for household use, there is no need to build such a large biogas tank."

"Yes, I originally thought about using it at home, and it's not necessary. But considering that I have to build a greenhouse in the future, to heat the greenhouse, etc., this amount will be large. So when you are planning the construction, you have to connect the The inlet pipes are all installed in place, so that I can directly connect the pipes and use them in the future.”

"It turns out that there are no other problems!"

After the two technicians surveyed and recorded the actual data on site, they immediately agreed to design for Chen Mo as soon as possible after returning, and ensured that the budget and drawings would be issued within a week.

Chen Mo has nothing to say. As long as the construction does not delay the construction of the new house and the use of it, it can be done, and everything else can be done well.

The place of the old house is almost combined with the neighbors, and there are several acres of land, so Chen Mo and Chen Ming talked about some later construction plans and so on.

"Uncle Ming, have you built a house to repair the road?" Chen Mo asked.

"Hehe, do you want to repair the road from the old house to the provincial road?" Chen Ming asked.

"Yeah, how do you know, Uncle Ming?" Chen Mo asked curiously.

"Haha, of course I thought of it myself. After I visited the old house, I found that the current road is too difficult to walk. Not to mention all the dirt roads, they are all deserted, and people can't go on rainy days. So I thought that if you are going to build a new house here, this road that is more than one kilometer must be repaired. And I happen to have experience in road building. Now the road to the market in the town is built by me. There is absolutely no problem with this road." Chen Ming said with a smile.

"That's good, Uncle Ming! I'll let you build this road. But you must give me solid materials. Although I just want to build a two-lane concrete road, the load-bearing must meet the national road standards, and the base of the road must be built according to the national road standards. , and the drainage of the roadbed must be repaired." Chen Mo said, thinking that the Hulu Valley will be developed in the future, then trucks and special construction vehicles must pass through this road, so if it is repaired now, it must be repaired, and it cannot be repaired later. That's why I put forward such high requirements. Anyway, the current dirt road and the surrounding land are all within the scope of my contract. In addition, the dirt road is relatively wide and can be built into a two-lane road.

When Chen Ming heard his request, he was a little stunned and took a deep breath, not expecting such high requirements: "Erwa, your requirements are too high, my construction team can't meet them, and even if it's construction in the county The team may not be successful, and they have no construction qualifications.”

Chen Mo was stunned for a moment. He didn't expect that he only raised the standard of a national road. Chen Ming could not meet the requirements, which was beyond his expectations.He himself didn't know the construction standards of national highways, but after inquiring and considering the future use, he proposed this construction requirement. He didn't expect to meet the national highway standards.

But he didn't say anything about lowering the standard, because in the future, according to his requirements, this road will definitely be used frequently, so he would rather build it according to high standards at the beginning than repair it later.

"Uncle Ming, if it doesn't meet my requirements, then you will repair this route. It's just flattening and laying some gravel, and it won't be difficult to walk on rainy days. I'll find another way later. The construction unit will do the construction." Chen Mo said.

"If it's a gravel road, then there's no problem. I'll do the roadbed treatment, so that you can spend more time. In addition, if you do this, the cost is not very much. You can give 5 yuan, and I'll give it to you. It's well repaired." Chen Ming said.

5 yuan is not high, and the roadbed and drainage must be reinforced, so it is a cost price.Chen Mo nodded and agreed, but he didn't expect that if he did something, he would have to do so much preparatory work.

But no matter how much work he has to do, he has to do it himself. There is no turning back, and his parents are still watching him, so he needs to devote his energy to finish things well, alas!I will cry if I continue!

In a flash for two days, the tiles in the main house and the bathroom of the family were laid and hardened for two days, and people could leave on it.Chen Ming also arranged for workers to come over to do the pointing and filling of the brick joints, as well as some post-work in the bathroom. All of them were completed in one day.Of course, it is also related to the fact that the workers do not have too many requirements for construction, otherwise it is jointing and post-processing, which cannot be completed without three days.

Chen Mo didn't care, because he would only live in this house for another year, and it might be overturned next year, so he didn't make strict requirements, but when he wanted to build a new house, he had to make strict requirements. This matter should be written down, and when I see Uncle Ming, he will say it well.

 If it looks good, please collect it and give a recommendation. The primary school students are grateful here!

  


(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like