Trillion Market Capitalization is Not a Dream

Chapter 253: Completion of 1 bidding section

Zhang Yunqing replied: "Okay, this should resolve the current difficulties. Then I will rest first. After I go to Mr. Hua tomorrow, he will call you."

Zhao Manfu replied, "Okay." He ended the call.

It is said that the preparation of Song Xiaoshan's construction organization design documents is also proceeding in an orderly manner.

Song Xiaoshan saw that it was time for everyone to have a coordination meeting, so he notified the three of them to go to the conference room on the top floor to discuss.

Song Xiaoshan saw that Wang Bin, a greening engineer, Zhao Dajin, a garden construction engineer, and Zhou Qingchun, a hydropower engineer, had all arrived, and he said, "Thank you for your hard work. Zhao Dajin, please tell me what you are thinking now."

Zhao Dajin said: "Manager Song, I have read the bidding documents, the bidding construction drawings, the bidding list, and several construction organization design template documents that you sent us. I think the first set of construction organization design documents is the same as the current bidding documents. The projects are relatively close, especially the garden construction projects, and the similarity is very high.”

Song Xiaoshan replied: "Okay, we know your opinion. Wang Bin talked about the greening situation."

Wang Bin replied: "The construction organization design template document for greening is more troublesome. The first, second, and third templates all contain the construction organization design content we need for this project. The content is merged together for easy reference and use.”

Song Xiaoshan replied: "Okay. The greening team will trouble you to combine the contents of the template to form the first draft document of the first tender. Zhou Qingchun, what about the hydropower situation?"

Zhou Qingchun replied: "Hydropower is relatively simple. The contents of several templates are similar. I think any template can be selected and modified in combination with the drawings."

Zhao Dajin replied: "Zhou Gong, if you can choose any template for your hydropower project, I suggest you choose the first template file I selected in the garden construction project, which will ease the difficulty of merging the final construction documents."

Zhou Qingchun replied: "Yes, then I will choose the first template for my hydropower project."

Song Xiaoshan arranged: "Okay, this will make it clearer. Please hurry up and compile the construction organization design documents for the first tender section. I will handle some work in this conference room. What do you have in the process of compiling? If you have any questions, you are welcome to come to me to communicate and solve them at any time. The meeting is dismissed."

After the three of them went out to compile the construction organization design documents for the first tender, Song Xiaoshan remembered some problems that needed to be communicated with the business department, so he called Lin Yiping and said, "Lin Gong, is it easy to talk?"

Lin Yiping said politely on the phone: "Convenient, Manager Song, please speak."

Song Xiaoshan asked: "Is the staffing table and mechanical equipment list of the project department ready for this bidding?"

Lin Yiping replied: "The project department has the staffing table, and I will send it to you later. The mechanical equipment list does not have its own machinery. Basically, it is rented, so you can configure it yourself according to your needs."

Song Xiaoshan replied: "Okay."

After Song Xiaoshan received the staffing table of the project department sent by Lin Yiping, he sent it to the garden construction engineer Zhao Dajin, the greening engineer Wang Bin, and the hydropower engineer Zhou Qingchun, and arranged for them to pay attention to the correct use of this table.

In the evening, the three-person construction organization design for the first tender section has been compiled and sent to Song Xiaoshan, who organized a meeting of the three to carry out the construction and work together.

Song Xiaoshan and three people repeatedly calculated whether the number of personnel in the labor plan is reasonable. After sufficient discussion, a unified opinion was formed, which was revised into the construction organization design document of the first tender section after the merger.

The construction progress bar map is more complicated. It took the four people almost two hours to reach a consensus. The responsibility for modifying the bar map was assigned to Zhao Dajin.

The four people discussed and discussed the layout of the temporary facilities of the project department as follows:

1. The setting of the construction project department According to the actual situation of the construction site, in order to enter the construction process as soon as possible, the construction project department is set up on the site.

2. The housing of workers and migrant workers is to set up part of the house near a mixing plant for protection and safety.

The rest are rented nearby houses to solve the living and accommodation of workers and migrant workers.

3. According to the situation, the construction unit will generate electricity and pump water to solve the production and domestic water and electricity consumption.

4. Setting of concrete mixing yard and stockyard The concrete mixing yard and stockyard are to be set up according to the on-site arrangement. It is used to solve post-concrete mixing yards, stockpiling yards, production and cement warehouses.

The four people also discussed and discussed the general construction plan, including the layout diagram and text description of temporary facilities on site, the situation of temporary facilities, processing workshop, on-site office, equipment and storage, power supply, water supply, sanitation, living, roads, fire protection and other facilities. layout.

Song Xiaoshan combined everyone's construction organization design documents to form the first draft of the construction organization design for the first tender, and then sent the first draft to Zhao Dajin, Wang Bin, and Zhou Qingchun for review~www.readwn.com~ to After twelve o'clock in the evening, the four people finally reached an agreement, and the preparation of the construction organization design documents for the first tender section was completed.

Song Xiaoshan sent the construction organization design documents for the first tender to the three people and Lin Yiping of the business department.

Song Xiaoshan arranged for the three people to rest early, get up early tomorrow morning to participate in the preparation process of the first tender, and continue to compile the construction organization design documents of the second and third tenders.

The next morning, Lin Yiping came to Huabai's office early to report: "Mr. Hua, Song Xiaoshan's team has sent me the construction organization design documents for the first tender last night. I took time to look at it this morning. There are some amendments that have been sent to Song Xiaoshan. According to their current progress, the preparation of the construction organization design documents, through the efforts of Song Xiaoshan's team, can meet the time limit of the bidding. "

Hua Baibai replied: "Okay, I understand. Have you seen Zhang Yunqing?"

Lin Yiping stood up and walked to the door of Hua Bai's office, looked around and replied, "Mr. Hua, Zhang Yunqing has already arrived at the office."

It took a hundred years to arrange Lin Yiping to say: "Then you can call him to come to my office."

Lin Yiping shouted, "Zhang Yunqing."

After Zhang Yunqing heard Lin Yiping calling her, she got up and went to Huabai's office.

Hua Baibai asked Zhang Yunqing, "Did you go back to the hotel to rest yesterday?"

Zhang Yunqing replied, "Have a rest."

Hua Baibai arranged: "Then today, you will do the list price work of the third tender section and follow the result documents made by Lin Yiping."

Zhang Yunqing replied: "Mr. Hua, Mr. Zhao Manfu called me last night and asked me to go back to the Nanshan Project Department as soon as possible today, saying that the few days I left had seriously dragged down the project department's job rush arrangements."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like