The Engineering Boss

Chapter 97: 10% of the rescue project completed

   Chen Yang is now stationed whole-heartedly on the rescue project, while other construction sites call to ask about it. Fortunately, nothing happened at other construction sites, and everything is proceeding in an orderly manner.

   A new day is approaching, and rescue projects are in full swing.

   Zhou Xinjin called after nine in the morning.

   Zhou Xinjin: "Chen Yang, how is it going? How much soil did you pull out yesterday?"

  Chen Yang: "Yesterday, I drove nearly 90 carts of mud and sand out during the day. At night, I drove more than 30 carts out, and the total was more than 120 carts."

   Zhou Xinjin: "At night? Did you work overtime last night?"

  Chen Yang: "Yesterday from eight o'clock in the evening to 11 o'clock in the evening, there were only three four-bridge trucks pulling the soil. Because it was pulling the soil at night, the speed slowed down.”

   Zhou Xinjin: “It’s really good to work overtime, but you have to pay attention to safety at night. The risk factor of this landslide is very high. Once a safety accident occurs, the gain is more than the loss.”

  Chen Yang: "I will pay attention to this. I have specially arranged people to observe the conditions of the mountain at night. Once there is an unclear situation, the people will be removed as soon as possible, and the machinery will be ignored."

   Zhou Xinjin: "Haha, young people are bold. Okay, I just ask about the situation. When I report to the above, I have a bottom. Remember, safety first, always remember."

   "When the landslide is about to be cleaned up, you call me, so I can contact them to have a look at the scene, and then determine the next implementation plan."

   Chen Yang: "Okay, I'll contact you then."

   Around ten o'clock in the morning, the four-axle vehicle that failed yesterday was finally repaired, and the five four-axle vehicles pulling the soil became six four-axle vehicles pulling the soil.

   As the construction scope was expanded a lot yesterday, today two excavators were loaded to pull the soil, and one excavator was used to clean up the landslide surface and remove some unstable areas to make the work below safer.

   However, the excavator is still somewhat limited. The height of the landslide is tens of meters high, and the excavator can only clear out the areas that can be cleaned. The remaining virtual soil is only to think of other ways to deal with it.

   Time is slowly passing by, and the mud and sand in the landslide section is decreasing a little bit. According to such a schedule, construction should be able to clear most of it on January 6.

   "Brother, do you need workers here?"

   Chen Yang stood on the side of the road and watched the excavator work not far away. Suddenly a middle-aged man who was close to fifty years old came to Chen Yang and asked, and he took out a cigarette and gave it to him.

   "This uncle, I don't smoke. We don't need workers here for the time being."

   "For now? When do you want it?"

   "Probably...when the landslide, mud, sand and soil are all cleaned up, some workers may be needed!" Chen Yang responded.

   The middle-aged uncle said: "I am a person not far away. I am thinking about working here, and I want to come here to do some work. If you need workers, you can tell me that we work very well."

   is the person near here!

   Maybe the next step in the construction process is to ask some workers for help. If you ask people around here, I don’t know if they can do it. I will only talk about it when the time comes.

   "Okay, I will notify you when the worker is needed."

   "Thank you, thank you. What is your phone number, I will remember one."

   Chen Yang told the other party his phone number, and the other party left after chatting with Chen Yang for a few words.

   In a blink of an eye, one day passed, Chen Yang calculated that the six four-axle large vehicles during the day pulled a total of more than 150 vehicles, which is more than 60 vehicles more than yesterday.

   I still worked overtime in the evening. It was also an excavator, a loader, and three four-axle vehicles working overtime. This evening, I drove nearly 20 more vehicles than the first night.

   Working overtime in the past two days to pull the soil, the landslide section has advanced nearly 30 to 40 meters, and the overall approach is close to about one-half of the completion.

   January 5th, the weather is overcast.

   At about four o'clock in the afternoon, while Chen Yang was instructing the excavator to clean up the landslide, the long-lost transparent panel appeared in front of him:

   [Release of the main task: contracting a project of more than 4 million yuan and organizing the construction of personnel-landslide rescue project]

  【Project completion reward: 437,520 yuan and hexagon】

   [Side task: complete 10% of the contracted project schedule within ten days (before January 10)]

   [Completion reward: 10% of the project completion reward, one junior administrator, one junior surveyor, and six junior workers]

  咦, 10% of the project has been completed so quickly!

   Chen Yang didn't expect that the mud and sand had not been pulled out yet, and this line task would be completed. It seems that working overtime these days is still rewarding.

But that’s fine, there will be rewards for completing the side tasks, and now he lacks staff. This time there are a junior manager, a junior surveyor, and six workers. These are the talents he is currently in short supply. .

   "Your end number xxxx card January 5th 16:16xx bank income (inter-bank transfer) 437052.06 yuan, the balance 2,495473.32 yuan [XX bank]"

   Not bad, not bad~www.ltnovel.com~ The money is in!

   Then the information on the transparent panel changed:

   [Release of the main task: contracting a project of more than 4 million yuan and organizing the construction of personnel-landslide rescue project]

  【Project completion reward: 437,520 yuan and hexagon】

   [Side task: complete 50% of the contracted project schedule within 20 days (before January 25)]

   [Completion reward: 50% of the project completion reward, one junior administrator, one junior construction worker, one junior material worker, and six junior workers)

   It takes only 20 days to complete 40% of the project. It seems that this time is really urgent!

However, this rescue project is more cost-effective than other projects. I think that the total price of the villa project is only 1.2 million yuan and the construction period will take several months, while the rescue project is more than four million yuan and only two months. This comparison shows who is the best deal. .

   System rewards are in hand, Chen Yang is more motivated!

   As night fell, the busy day was finally over, and Chen Yang was also a little tired.

   "Brother Chen, after working overtime tonight, the road will be cleared at noon tomorrow at most. Can the six four-axle vehicles be removed?" Hu Xiaojun found Chen Yang after eating.

  Chen Yang was silent for a while, and then said, "I'll talk about it after you grab it tomorrow. If you want to remove it, then remove the four four-axle vehicles first, leaving your car and the other car."

   "Then the excavator and loader should be removed?"

   "The excavator is not busy withdrawing. I rent it on a monthly basis. I have only done a few days of work now. Wouldn't it be a loss if I withdrew it?" Chen Yang said, "I was caught by the four-axle vehicle, and the others were not withdrawn."

   "Then Brother Chen, the mud and sand from the landslide have been pulled out, what should I do next?"

  

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like