Chapter 314 President Lin, are you sure you built Hope Primary School?

Everyone at the scene looked at each other. They didn’t expect that the big project Lin Qian said was actually a charity project.

In addition, it seems that it is not a face-saving project for small troubles. Lin Qian opened his mouth to a total of 100 Hope Primary Schools, which still require high quality and high standards.



If it is built in accordance with the standards of urban private primary schools, even if it is hoped that there are few primary school students, there is no need to build as many teaching buildings as private primary schools in the city. It is calculated based on the minimum standards of private primary schools. Multimedia teaching equipment, canteens, plastic playgrounds, etc. It is basic equipment. As for the more advanced ones, I am afraid that each school will start with a minimum of 3 million.

One school is 3 million, 100 schools are 300 million!

After calculating this number, many people were taken aback, and then the eyes of many people looking at Lin Qian changed.

With so much money for charity at one time, this kind of ideological realm and height really makes it hard for everyone not to show respect to Lin Qian.

And Li Wanruo and Ling Man, who were sitting next to Lin Qian, were shocked when they heard what Lin Qian said. Ying Hong’s pink lips were subconsciously opened and closed, and their eyes were full of incredible expressions. .

Both women knew that Lin Qian was rich. From the RV under them, the bodyguard accompanying Lin Qian, and the things Lin Qian bought for the children yesterday, it was not difficult to see Lin Qian’s financial resources.

But Rao is so, Lin Qian’s wealth is far beyond the imagination of the two women.

What was even more beyond the imagination of the two of them was that Lin Qian turned out to be such a enthusiastic teenager!

“Mr. Lin, the 100 Hope Primary Schools will be completed in 40 days, and the construction period is a bit overdue.”

A middle-aged man with glasses near Lin Qian, judging from his badge, was a senior engineer from Tiangu Construction Company. After he was shocked, he hesitated and said with a little embarrassment on his face.

“You can get foreign aid, you can make the workers work in two shifts day and night, anyway, I will see 100 Hope Primary Schools completed within 40 days, and it must be completed with quality and quantity. Money is not a problem.”

Lin Qian’s face was calm, and he responded in a calm tone.

The system gave 50 days, but to be on the safe side, Lin Qian reduced the construction period to 40 days. This behavior is very similar to the way of communicating tasks layer by layer in an enterprise. The boss gives the subordinates 10 days, and the project manager below gives them to the subordinates. 8 days, then the team leader below will give his subordinates 7 days.

Although this behavior is often criticized by the bottom layer, it is indeed a relatively safe and good strategy to control risks.

When everyone heard Lin Qian’s last words, the Tiangu engineer suddenly became silent.

Saying a thousand words and ten thousand, in the final analysis, it is money. Now Lin Qian directly said that money is not a problem, and these people have no problem immediately.

“Mr. Lin, you just said that all Hope primary schools in our project are built in accordance with the standards of private primary schools in the city, but the standards of private primary schools in our city are also high and low. This standard is a bit too general, I don’t know. Can you elaborate more?”

No one had any questions about the construction period, and everyone became serious, and the cost engineer of another construction company immediately asked Lin Qian tentatively.

“Um……”

Lin Qian hugged his shoulders and rubbed his chin with his right hand subconsciously. He pondered for a moment.

“Multimedia teaching, plastic playgrounds, canteens, etc., I won’t say much. They are all the most basic. I will say something needs to be added.”

“First of all, I think there should be an additional audiovisual room in the school. There are too few entertainment activities for children in the mountains, and they have basically lived in the countryside since childhood. They have very limited understanding of the outside world. Adding an audiovisual room can make these children more These entertainment activities can be used to learn more about the outside world through videos or movies.”

“Secondly, I think there should be…”

Lin Qian said whatever he thought of, and everyone sitting in front of him bowed their heads, holding pens and notebooks and recording wildly.

As Lin Qian said more and more, many people felt a little sweaty in their heads.

This is Hope Primary School?

I’m afraid this is not building a noble school!

I would like to ask who has heard of Hope Primary School that has its own music room, audio-visual hall, multimedia activity room, and indoor stadium, and at the same time, the teaching building needs to be heated without blind spots?

I would like to ask who has heard of the hope that there should be an independent canteen and teachers’ dormitory outside the primary school. At the same time, the playground needs to have a badminton court, a table tennis court and even a volleyball court. The greening degree is required to reach 70%?

I would like to ask who has heard that when the Hope Primary School is being built, the road from the Hope Primary School to the nearby village where the children go to school is also repaired? !

Lin Qian said as much as he thought. When he said that he was dry and dry at the end, he couldn’t think of anything else that could be added before he could stop.

“Thinking so thoughtful, when such a school is built and the system task is finally evaluated for completion, even if it doesn’t give me a good one, it should be no problem at least to be good…”

Lin Qian was drinking water while poking in his heart.

“Um……”

“That’s all for the time being.”

Hearing Lin Qian’s words, everyone in front of Lin Qian was relieved, and then they looked at each other, all seeing the bitter smiles in each other’s eyes.

“Mr. Lin, if you build Hope Elementary School in accordance with the specifications you mentioned, the cost of a Hope Elementary School will probably not be able to stop the cost of 6 million yuan. If you add up to the overtime pay for workers who catch up with the construction period, the cost of the last Hope Elementary School will be included. It would cost nearly 7 million.”

“A Hope Primary School is 7 million yuan, and 100 Hope Primary Schools are 700 million yuan. President Lin, do you decide to build it according to this standard?”

The senior engineer of Tiangu Construction Company who was wearing glasses, after communicating with the cost engineer around him, finally quoted Lin Qian an approximate price.

As for the heads of other companies, they all nodded their heads in response to the words of the senior engineers of Tiangu Construction Company. Obviously, their preliminary approximate cost is similar to the cost estimated by Tiangu Construction Company.

Li Wanruo, who was sitting to the right of Lin Qian, had her thin pink lips slightly open, and the beautiful peach blossom eyes under the thick glasses were full of blankness.

7 billion…

This number made her unimaginable.

So much money was just to build 100 Hope Primary Schools. After Li Wanruo was at a loss, she looked at Lin Qian’s eyes, her eyes were full of inexplicable meaning.

Thanksgiving, admiration, worship…

As a child who grew up in an orphanage and grew up slowly with the help of the country and the help of people in society, she has always been grateful for the country and society.

So since she went to university, she has been giving back to the society and the country with her weak power.

Today, Lin Qian, who is nearly the same age as her, will use her own efforts to create schools and buildings for tens of thousands of orphans. Her favor with Lin Qian at this moment can be said to have soared like a rocket.

The eyes of that beautiful peach blossom are all soft like water…

PS: Regarding the issue of construction costs, I have discussed with a few elder brothers who are engaged in engineering and construction in the book friend group. Without counting the land, the price of building a relatively top-level Hope Primary School will be almost a thousand and eight. At about one million, this price should be more realistic. If there is a big man in the engineering industry who asks for a light spray, the dog’s head will be safe!

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like