Scholar’s Advanced Technological System

Chapter 518: 40 billion big projects!

Go to Beijing.

Within a ring, some mysterious place.

Standing at the door of the office, Director Lu took a deep breath and reached out and knocked gently on the door.

After hearing a "come in", he opened the door and walked in, respectfully.

"You looking for me?"

Looking at the leader of the energy bureau standing in front of the office, the old man smiled slightly and said.

"I have a letter here. You can take a look."

Without hesitation, Director Lu stepped forward and picked up the letter from the table.

Just seeing the title part, he said secretly in his heart.

If you think about it, there are only a few people who can send the letter directly here.

As he expected, the letter was related to the incident in Jinling.

Your Excellency.

I believe you have heard that in the latest experiment of the STAR Institute, our researchers have successfully confined the magnetic time to more than 60 minutes.

The results of this research made me foresee that in the not too distant future, the deuterium resource will become a brand new and important energy source, which will be used by us. This energy source is more efficient, cleaner, and closer to "essence" than anything we know.

In theory, a complete reaction of 1 kg of deuterium and tritium can release 108 million kWh of energy. According to a ratio of 35, 37.8 million kWh of electricity can be produced.

It is estimated that only 167 tons of deuterium and tritium mixture is sufficient to meet China's annual demand.

Leaving aside the halogen which can be retained as an intermediate product, as the main deuterium consumed, the cost per kilogram is less than 4,000 yuan. And with the expansion of production scale, this cost still has a very broad space for reduction.

Based on these obvious data, we only need to see through an uncomplicated calculation that the cost of nuclear fusion power generation will be less than one thousandth of the cost of traditional thermal power, or even lower.

The birth of this energy will completely change the energy structure of modern society, and it will also completely change the production and lifestyle of our society ... even everything we know.

Here, as a scholar, I have an obligation to remind you that we have stood at the turning point of the era, and the door to the new era is in front of our eyes.

Of course, the price of opening this door is doomed.

As for whether to open it, the decision is yours.

The letter is not over here, and there is a timetable for the commercialization of controlled fusion technology, the expected goals of the DEMO demonstration reactor, and a budget table.

For the time being, without going through the following content, Director Lu, after reading the first page, frowned fiercely.

Throughout the letter, the euphemism of writing was all about how good and important the prospects of fusion energy were, but from that crooked word seam, he only saw the words "" Hit money. "

The above lists the estimated parameters of the DEMO device in detail, as well as the performance expectations of the DEMO device after completion.

Project goal: to complete the construction of the DEMO demonstration reactor by 2025.

Evaluation criteria: the lead-out surface of the RF negative ion source prototype is 0.45m × 3.2m, the uniformity of the RF plasma under multiple drives is better than 95, the current density of the negative ion extraction is not less than 300A / m2, the beam intensity is greater than 20A, and the comprehensive index of the negative ion beam reaches Energy 200keV, beam stabilization duration reaches 60min ...

Although he had contacted Lu Zhou a few times before, he didn't even know it before. Professor Lu was involved in engineering, and the plan was pretty decent.

See this plan from beginning to end.

The more he looked back, the more solemn the expression on his face.

Putting down the letter in his hand, Director Lu shook his head with a headache.

"43 billion RMB ... Professor Lu can really spend money for us."

And it's not just a question of money.

Especially in the plan, the phrase "This reactor can meet the power demand of the whole province of Jiangsu", it sounds like a bragging force, and it's still out of bounds.

You have to know that the annual power consumption in Jiangsu Province reached 580.79 billion kWh, second only to Guangdong's 595.89 billion kWh, ranking second in the country!

Even if this power station is running 24 hours a day, if you want to complete the 580.79 billion kWh power generation target in one year, it will have at least 66300M ​​of power!

What is the concept of 66300M ​​generating power?

The total installed capacity of the Three Gorges is only 22,000M, and the six units in Daya Bay add up to about 6000M.

In other words, the power of a fusion reactor alone is equivalent to the Three Gorges with three full powers? Eleven Daya Bay nuclear power plants?

What kind of monster is this so special?

Reason tells Director Lu that this draft is not drafted.

If he had put the plan on his desk for another person, he would have said nothing tossing his face.

however……

After all, this cow was blown by Professor Lu.

It's tempting to think about it ...

Looking at Director Lv with a complex expression, the old man smiled and asked, "How is it? What do you think after reading it?"

"The plan is so wild, I do n’t know why he is so sure, but ..." The figure came out. This is not asking for his own opinions, but just letting him talk about his feelings. Director Lu hesitated and said carefully. I admit that what he said is indeed what we need! "

Huaguo is a large energy consumer. The coal and oil consumed each year are counted in units of 100 million tons. In particular, the total coal consumption accounts for almost half of the world's total coal consumption!

If, as Professor Lu said in the letter, only 167 tons of deuterium and tritium mixture can be used to meet Huaxia's annual electricity demand, then with the wide application of fusion energy, China ’s future energy expenditure may even be Less than a fraction now!

What's more exciting is not just the economic value and political and political significance behind it, but also its cleanliness.

From subsidies to the new energy industry to the "quota quota indicators" for the minimum renewable energy power consumption stipulated by the provincial administrative regions in the Measures for Renewable Power Energy Quota Assessment, for the time being, regardless of the local implementation of the policy, the state The determination to develop clean energy has always been unquestionable.

Otherwise, the term energy saving and emission reduction will not be repeatedly mentioned at every conference.

This highly efficient, cheap, abundant and almost non-polluting energy source can almost solve once and for all the problems faced by China today in its "sustainable development strategy." UU Reading www.uukanshu.com

If all this can be achieved, they really need to develop the technology at all costs.

"It's a bit empty," the old man nodded, and said after a pause, "but I think it's worth a try."

Hearing this sentence, Director Lv looked slightly moved and immediately said respectfully.

"I know."

Although there were still some doubts in his mind about what was stated in that letter, his doubts are no longer important.

It is impossible for a single person to make a random decision on a large project of more than 40 billion yuan. Now listening to this adult's tone is so easy, obviously this proposal has been unanimously approved by the Presbyterian Church.

Now that even the senior management agrees, there is only one thing he needs to do now.

That is to draw up a plan to meet all the conditions proposed by Professor Lu, and make every effort to ensure that this "DEMO demonstration reactor" project can be launched quickly!

Suddenly thought of something, the old man sitting behind the desk asked.

"Well, how is the project of the International Controllable Fusion Energy Program Implementation Center going?"

Director Lu answered truthfully: "From the timetable, they plan to start construction of a demonstration reactor in 2025 ... but the conditions are not yet mature in all aspects. It seems that it must be postponed.

The old man shook his head: "It's too slow."

It's okay not to compare.

With this comparison, the gap becomes apparent.

Director Lu: "... After all, scientific research is anxious."

"You are also talking about slow work," the old man nodded, and continued to say, "let them study slowly. Since they are not in a hurry to spend money for the time being, they should start with their funds. Move some out. "

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like