Chapter 75

Seventy billion!

After hearing this number, Li Qi was silent for a long time.

Seventy billion orders come from all over the world. And this number will get bigger and bigger and more gorgeous!

Li Qi took a deep breath:

“The snowy airport is not enough.”

With a murmur, Li Qi hung up the phone.

Helpless, I can only hope that Yishan Reclamation Group’s construction speed. If the Mount Everest elevator can be repaired in advance, then these traffic conditions can be leveled by freeing up your hands!

but now……

Li Qi glanced at the mysterious mountain that was faintly visible ahead, and sighed: “Now, the race against time is officially started!”

But this time in Tibet, Li Qi was surprised to find that his altitude sickness had faded a lot. Although I still have difficulty breathing, it is much better than when I had a splitting headache when I first came here.

The cough continued. But there is no hemoptysis, which shows that the pulmonary edema has improved.

This discovery surprised Li Qi. The human body is indeed a highly adaptable organization!

at this time.

Base camp.

With the sound of a slogan, more than 50,000 workers stood at the foot of the mountain, carrying steel cables on their shoulders and dragging forward vigorously. Their purpose is to straighten the cable…

“One, two, three, go!”

“One, two, three, go!”

The sound of a trumpet resounded throughout Mount Everest.

Many people looked at it with anxiety, just watching the trackers in the ice and snow, preparing to complete the final work.

Fifty thousand people are carrying steel cables, and a handful of more than one hundred forklifts are also helping to tow them. But, still too little…

Ga Riwang watched this scene and murmured involuntarily:

“When there is no equipment, they can only rely on their hands completely…”

Sai Rui looked at Mount Everest in the clouds and sighed: “Yes…”

The entire construction site has officially entered the ‘work’ state at this time.

Only 50,000 people remained in the entire base camp.

The remaining nearly 100,000 people have all been on Mount Everest at this time, working in every corner and area of ​​Mount Everest. ,

Those three thousand nodes, tens of thousands of foundation pits, all require manpower to dig!

No equipment!

The initial idea was immature. The sky above Mount Everest is freezing cold, and the electronic equipment simply doesn’t work well. Secondly, the difficulty of dragging electric wires is too great, even more difficult than erecting steel cables!

Moreover, most of the equipment uses electricity.

However, above Mount Everest, there are no electrical facilities at all. The only generators are used for lighting in the workshops of the base camp. Nothing else!

At this time, on the cliff of the second step.

A hundred people who moved mountains and reclaimed the sea took steel drills and sledgehammers to dig out the thick ice. Then he smashed into the rock with one hammer after another.

“Ding”



‘Hey–’

‘Ding’

“Huh…”

Above Mount Everest, sparks are splashing everywhere.

Li Ming wore a fluorescent suit and walked around constantly, watching the worker who was digging with steel drills in the ice and snow, a flash of worry flashed in his eyes:

“The hardness of the rock above Mount Everest is beyond imagination. How long does it need to be excavated?”

“Hey, there is no electricity. Everything is in a primitive state.”

After that, Li Ming yelled:

“Just work harder, the people from the Sichuan-Chongqing branch came and brought steel. They are quickly building a temporary steel plant at the foot of the mountain.”

“The large forces behind are also approaching, they will bring us equipment and energy!”

“Go harder!”

“Yes!”

“Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding Ding d

On the entire Mount Everest, tens of thousands of steel rods are chiseling the hard ice and rocks of Mount Everest at the same time!

Everything depends on manpower!

Among the 3,000 nodes, each foundation pit must have a depth of at least 20 meters and a diameter of at least one meter. Only in this way, after pouring concrete, can it withstand more than 10,000 meters of suspended steel rails.

At this time, Li Ming’s intercom rang: “I am Li Qi.”

A look of sadness flashed in Li Ming’s eyes: “Host. I’m on the second step.”

“How is the progress of the project?”

Li Ming watched the workers chiseling for a whole day, only to a depth of half a meter. After hesitating for a while, Li Ming sighed:

“It is not optimistic. According to the current progress, it will take at least one month to dig out all the foundation pits…”.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like