Build Madness

Chapter 577: Tiancheng Standard, Tiancheng Speed

Xincheng Xingyue Bay.

Ge Xiaotian sent away the leader Xue Da, and then welcomed supervisors from Dongshan Jifu, Nanhe Zhengfu, Beijing and other places.

The other party was not from Tian Cheng's side, but was entrusted by Xue Da's leader to be responsible for the supervision of various projects in the new city Xingyue Bay.

Of course, the other party knew Tian Cheng very well.

He is not only the former subordinate of Chief Engineer Liang, but also an old colleague of Professor Hu.

The scale of the Xincheng Xingyue Bay project was the largest in China before Wangjing Xingyue Bay started construction.

Such a large scale also made the work of the supervisor very heavy. It took two days just to get familiar with the construction site.

Immediately afterwards, another day was spent on staff training and joint review of drawings.

Fortunately, Tiancheng's construction standards are extremely strict, and they have been widely circulated in the industry as early as last year. Coincidentally, Huaxia has not yet issued specific building construction standards, so they copied Tiancheng's standards into the provisional regulations.

include:

Unified standards for construction quality acceptance of construction projects,

Code for acceptance of construction quality of building foundation engineering,

Specification for acceptance of construction quality of concrete structure engineering,

Code for acceptance of masonry construction quality,

Specification for acceptance of construction quality of steel structure engineering,

Specifications for acceptance of construction quality of timber structures,

Code for acceptance of construction quality of underground waterproofing works,

Roofing construction quality acceptance specification,

Specifications for construction quality acceptance of building ground engineering,

As well as drainage, decoration, ventilation, air conditioning, electrical, elevators, management, design, material inspection methods, etc.

To sum it up, it's four fingers thick paper...

As a supervisor, he must be familiar with the skills of eating. Now that he came to Tiancheng, he was both supervising and learning.

As a result, the supervisory institutes in other regions heard about this and came here one after another...

Good guy, now I'm familiar with everything.

Afterwards, in the midst of all the attention, the eighty construction departments carried out their operations in an orderly manner according to the original plan, and began to continue the work during the holidays a year ago: the main construction of the negative floor.

Build the formwork support, bind the steel bars of the wall columns, support the formwork of the beams and slabs, bind the steel bars of the beams and slabs, pre-embed the installation pipelines, and finally pour concrete...

The whole process usually takes 20 days, but Tiancheng only needs 10 days relying on self-developed cement and special equipment.

subsequently.

The construction of the main structure on the first and second floors of nearly one hundred and fifty buildings has begun.

The steps are similar to the construction on the first floor, but Tiancheng used climbing frames for the first time. (Dust net has been used in the previous article)

The climbing frame, also known as the lifting frame, is composed of guide rails, vertical keels, rigid walkway plates, trusses, rigid triangle brackets, and horizontal connecting plates connected by bolts.

In addition, there are anti-fall systems, climbing systems that rely on hydraulic devices or electric hoists, and construction protection systems.

It is a new type of construction work platform that reduces scaffolding or replaces scaffolding. It can effectively reduce steel consumption and greatly protect the safety of construction personnel.

In 2001, neither China nor overseas has promoted this kind of equipment.

Relying on steel structure and mechanical techniques, Tiancheng developed a new type of scaffolding system, which also obtained a patent.

The construction of the low first and second floors does not need to be lifted by hydraulic devices, and the supervisors do not understand the function of this thing.

But when twenty days later...

February 17th.

Under the incredible eyes of the supervisors, more than 150 climbing frames slowly rise, and the construction of the main structure on the 3rd to 26th floors, or the 3rd to 32nd floors is started.

At this point, Tiancheng Engineering Department began to show its power!

Relying on a complete supply of logistics materials, construction in one day, maintenance in two days, and one floor in three days, the climb can be discerned by the naked eye...

During the maintenance period, large forces moved to the northern foothills one after another to lay a runway around the mountain.

Another part of the staff is beautifying the banks of the Panlong River.

If a video camera is used to record the Xingyue Bay construction site in the new town and fast-forward, the Tiancheng employees are like a group of Popeyes who ate spinach...

Phew, got into the building, jingled, finished pouring the first floor.

Whew, during the maintenance of the building, I went straight to the northern mountains to dig rocks.

Phew, maintenance is complete, lift the climbing frame and continue pouring.

Whoops, hauling gravel and paving the road around the site.

Phew, the banks of the Beaulieu River are getting more and more beautiful...

Phew, the new town of Xingyue Bay has taken shape...

Old Shen was already petrified.

In the past one and a half months, he hardly left the construction site, just sitting in the lobby, sipping tea, watching Tiancheng's hundreds of tall buildings rise from the ground...

And turn around and take a look at your own home.

Tiancheng had a holiday two years ago, but Dongshan Jianlian didn't have a holiday. He worked overtime and built the floor to the eleventh floor in three months, which was halfway to the top.

Originally, he thought that he could get rid of Tian Cheng a lot, but now look...

My family is about to be overtaken!

Thinking of this, Lao Shen couldn't sit still, and contacted Wei Changfeng anxiously.

Well, the two are true allies.

Satellite phone connection:

Old Wei, you have to help me. Tiancheng Xingyue Bay can swallow half of the first batch of relocated 100,000 people in the old city of Zaoshi! We don't want to find a way to speed up the Ginza community. Entering the second phase of the project, who will buy my real estate? I'm done, Tiancheng and Tianhao will work together to get you, can you resist?

Old Shen, it's hard for me too! Gou Ri's Chen Feng went to my hometown to set up New Commodity International, I don't know where he got so much money, and he has a good relationship with several super fruit merchants in Guangqu and Xiangjiang. People unite together, that's pressing me to beat me!

...

Old Shen, I'm not trying to shirk, I'll take a picture for you, look, I've lost another fifty pounds, and I can't even compare to that fat black Ding Hao!

...

Shen Zhipeng rubbed his brows, No matter what, even if you give up the Nanhe market that is stalemate with Tianhao, you still have to help me. As long as I resist and sell Zaoshi New City Ginza, we can transfer the funds to Beihe, which we have cooperated with. project.

I understand...then, I will find a way to get out and support Zaoshi New City Ginza!

ASAP!

Old Shen picked up the binoculars with a sad face and continued to observe Xingyue Bay, a new city in Zaoshi.

That green scaffolding wrapped in a protective net, once started to move upwards...

etc!

Old Shen rubbed his eyes, and suddenly saw that Tiancheng's more than 150 buildings were actually installing construction elevators...

What do you mean?

Isn't it necessary to follow the construction elevator when it is half built?

how……

Without waiting for old Shen to clear up his doubts, Tiancheng's staff began to move the bathroom, the exhaust duct between the kitchen...

???

With doubts, Shen Zhipeng waited and watched for two days.

Then found out...

The Tiancheng building reached the sixth floor, and the construction of blocks and secondary structures actually started!

(In 2001, there was no requirement that 17 floors can be used to build blocks.)

Countless Tiancheng employees, after completing the runway around the mountain and the corridor on the top of the mountain, rely on the engineering elevator,

Formwork for waterstops and concrete pouring for toilets and air-conditioning panels,

Plant reinforcement and masonry for window sill top pressing, etc.

For concrete members, reinforcement binding, formwork support, concrete pouring...

Isn't this too fast? Old Shen felt his scalp tingling.

However, Tian Cheng's divine operation was still not over.

When the building reached the eighth floor and the blocks were advanced to the third floor, thick smoke billowed from the Tiancheng construction site, which lasted until noon the next day, which coincided with the time of the first two construction and maintenance.

(After the blocks are poured, they are cured with steam at 60°C for 17 hours to make the concrete reach early strength and shorten the curing time. This technology is also used for the Incheon Bridge, so a prefabricated beam can be made in two days.)

When the dense fog dissipates, the building will go to the ninth floor, and the blocks will go to the fourth floor...

Even started an energy-saving project again!

Immediately afterwards, in the next maintenance interval, Tiancheng employees dealt with the first floor of the inner and outer walls of each building, nailed steel mesh sheets at the intersection of different materials, and then watered, sprayed grout, dotted, punched reinforcement, and plastered layer by layer. Corner protection, bag opening, maintenance...

Plastering the interior and exterior walls?

Shen Zhipeng's heart trembled, he rushed straight into Tiancheng's construction site, and found someone wearing a red hat.

Second Ge, if you can put the tiles on tomorrow, I, Old Shen, will do it with you from now on!

Why? The construction of the upper floor is not over yet. I'm laying tiles now. What if the tile master is hit by debris? Besides, if you want to do it with me, I won't accept it!

...

Shen Zhipeng ignored someone's ridicule, stared at the Tiancheng construction site carefully, and even stood on tiptoe to get a closer look...

Ge Xiaotian was happy in his heart, and waved his hand, Drag him away!

Come on, I'll just take a look...

What the hell are you still doing!

Brother Ge, teach me, I'll give you money!

Oh? Give me money?

Ge Xiaotian raised his eyebrows, walked into the temporary office, and asked someone to serve tea, What do you want to learn, tell me quickly, you should have received invitations from the leaders on the 312 Arbor Day tomorrow, I am going to rest early, and I will catch up early tomorrow morning. past.

No rush, no hurry!

Shen Zhipeng stood at the door and continued to look at the 'climbing frame', What is this?

A digitally controlled hydraulic climbing device, self-developed by Tianji, high in quality and low in price!

How much is a set?

This is Tiancheng's patent, a secret that the company does not pass on. You and I are in a competitive relationship. What do you think of this price?

One hundred thousand sets!

One hundred thousand?! Ge Xiaotian couldn't help shouting.

Climbing frames are basically sold by the ton, which follows the price fluctuations of steel, including processing fees and hydraulic devices, or changing to electric hoists, the cost is about three times the price of steel, plus twenty or thirty yuan per square of climbing frame safety net , The price is about 4 to 8 times that of steel.

A set of conventional climbing frames weighs 2 tons and costs no more than 5,000 yuan.

And it doesn't have any technical content, it's just steel pipes and steel plates plus a transmission system that pushes the scaffolding as a whole to climb upwards.

People in this era don't use it, mainly because there are few high-rise buildings, and many time-saving techniques have not yet been realized.

Wait three to two years, the infrastructure will explode, and various construction methods will emerge in an endless stream, and the climbing frame will soon become a routine device.

And one and a half months later, the new city of Xingyue Bay will be completed, and the second phase will need to be postponed for a year. If you leave this thing in your hands, it will soon rust.

If it is transported to Nanhe, or Wangjing, its own value will not compare to the transportation fee, but it would be a pity to lose it...

With the idea of ​​dealing with it cheaply, Ge Xiaocai would say that the quality is good and the price is cheap.

One hundred thousand, very profitable!

Sell ​​one old set and make twenty new ones!

Shen Zhipeng watched Ge Xiaotian fall into silence, Don't be silent, this way, 150,000!

???

Two hundred thousand? It's a bit expensive!

...

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like