Super Orchard

Chapter 363 Design Drawings

Chapter 363 Design Drawings
Weilong Technology Co., Ltd. has grown in business in recent years. The factory has been expanded several times, and the number of employees has grown from more than 100 at the beginning to more than 1000 now.

These people perform their own duties, and those responsible for the construction are now basically building greenhouses in the Jinquan Orchard. In addition, they also employ a large number of temporary workers to work together.

The people in the company who were in charge of field surveys and design and construction drawings were in the company, and they were working on other orders. Weilong called some of the most experienced people to Jinquan Orchard.

Some of these people are senior employees who have followed Weilong many years ago, some are talents poached from other companies outside in recent years, and some of them are people that their own company focuses on training. They are all the top capable people in the company.

It was already mid-afternoon when these people came to the open area of ​​the western orchard. Although it was still hot outside, the sun had already slanted to the west, and there was no burning pain when the light shone on their bodies. Under the arrangement, quickly start a full range of measurement work.

Various instruments were constantly changing in the hands of the staff. Until the evening, the measurement work was not over yet.

What Shen Yangguang meant was to let everyone go back to rest and continue to measure tomorrow. Wei Long waved his hand and found someone to get a temporary power supply, set up a few headlights, and led the technicians to continue working.

He was busy until after eight o'clock, when the whole sky was completely dark, and the survey work was finished. Shen Yangguang hurriedly arranged for the staff to pick up the car, and brought these people to the staff restaurant for dinner. The food has already been prepared here. wait for them.

Wei Long wanted to be polite at first, and planned to take a few technicians back to the county town for dinner, but of course Shen Yangguang would not agree, since he was so busy with his own affairs so late, he should provide a dinner.

The next day, Weilong did not show up at the Golden Spring Orchard. He was arranging technicians in the company to start precise calculations of various data for the construction of the greenhouse, as well as the specifications of various customized materials to meet the construction requirements. An unprecedented super greenhouse.

For the list of Jinquan Orchard, there is no other reason why Weilong is so concerned about it. It is because when his company was struggling and seemed to be unable to sustain itself, it was Shen Yangguang who sent orders one after another, so that Weilong Technology Limited came alive again.

Since then, orders from Jinquan Orchard have been continuously delivered, and Weilong’s company has grown stronger by relying on these orders. It can be said that if there are no orders from Jinquan Orchard, there will be no Weilong today. Therefore, he is very interested in Shenyang. Light is very grateful.

Therefore, Weilong will give the biggest discount on every project payment, and at the same time, it will try its best to complete every order. Just like this time, Weilong will try not to drop orders from other companies. All the manpower and material resources that could be mobilized were concentrated in the Golden Spring Orchard.

For this, Shen Yangguang also thanked Weilong more than once. Unknowingly, the two became very good friends based on the orders they exchanged. They all said that Shang Hai was ruthless, but it seemed that it was not absolute.

Three days later, Wei Long brought the architect and a large number of drawings and architectural plans to the Golden Spring Orchard, and began formal discussions with Shen Yangguang on specific construction matters.

Shen Yangguang flipped through the blueprints one by one, and after listening to the designer's explanation, he was very satisfied, pointing to the roof like the Sydney Grand Theater and said: "Mr. Wei, your company is really full of talents. It’s such a perfect idea.”

The span width of this greenhouse reaches 600 meters. According to the general construction method, the width of each side of the greenhouse will be 300 meters wide. Such a wide width, in order to ensure that the rain and snow can fall in time, even if there is an automatic heating system Help, also need enough slope.

According to the width of 300 meters and the required slope, the height of the roof ridge in the middle of the greenhouse needs to be nearly [-] meters higher than the lowest place on both sides!
Such a high height is a very big challenge, not to mention the difficulty of construction, and it will be seriously higher than the ridges on both sides of the greenhouse, and the ridges will lose the effect of sheltering from the wind. There is no guarantee of firmness, there is no way, the roof of this greenhouse is too big.

The turtle back design given by Weilong Company can solve this problem very well. From the drawings, the roof of this kind of shed is almost horizontal and slightly curved as a whole, but there are dozens of rows of diamond-shaped sharp corners on it. A diamond-shaped sharp corner is like an old-fashioned roof ridge in the village, with enough slope for rain and snow to slide down quickly.

And the height of these diamond-shaped sharp corners is only a few meters high, so there is no need to worry about being affected by strong winds if they exceed the ridges on both sides.

In the middle of each row of diamond-shaped sharp corners, there is a slightly curved drainage ditch on both sides, which is used to slide rain and snow down smoothly.

This whole set of designs not only perfectly solves the problem of heavy snowfall in Jinquan Village in winter, but also looks very beautiful, just like a work of art.

Shen Yangguang praised him again and again, and then said: "Mr. Wei, I can't tell that your company is really great now. In the past, the drawings you produced were all about quality and effect. Now not only that, but also pay attention to aesthetics, which is great."

Wei Long hurriedly replied a few words modestly, and then began to chat about other matters.

In addition to the special design of the roof, the internal steel frame structure is also newly calculated and designed. A large amount of relevant mechanical structure knowledge is used. Only a few pillars are used to transform the 60 square meters The big shed is firmly supported, so that there are few thick pillars inside the shed, and it looks more beautiful.

The last is the construction cost of the greenhouse. The construction cost of this super greenhouse is more expensive than the row of super greenhouses in the east, nearly 1000 yuan per square meter, and the construction cost of the greenhouse per mu is as high as 60 yuan. The cost of the kind of greenhouse is several times higher, and this is the price after the biggest discount given by Weilong.

The total area of ​​this greenhouse is 60 square meters, which is 4000 mu, and the total cost is as high as [-] million yuan!
After reading the budget book given by the cost engineer, Shen Yangguang formally signed the construction contract with Weilong. Jinquan Orchard has no money left, but now Weilong and the others will continue to build other ordinary greenhouses, and one will be needed at the earliest Many months later, the construction of this super greenhouse worth 4000 million yuan will start. At that time, the summer fruits in the orchard have already been sold, and the profits earned are completely enough to cover the cost.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like