Chapter 451 The Scheduling Meeting of the Old Canal Project

Chapter 451 The Scheduling Meeting of the Old Canal Project (ask for a monthly ticket!)
The head of the vertical centrifugal pump cannot be reached, so it is better to propose it now than to add a level of water lifting at the end.

Make changes in the direction you want.

There is a problem here, which I pointed out just now, that is, not all sub-projects make money in the quotation of the project list.

For example, the water pumping station is basically in a state of losing money.

The water pumping station lost money not because the price was inappropriate, but because the project volume was small. Although the sparrow was small and well-equipped, the water pumping station was only [-] or [-] square meters, but like building a house, there were a lot of processes.

As a result, every process is delayed, and some recyclable materials cannot be recycled, such as templates.

In addition, the water pump house is built on the mountain, and the transportation of construction materials is a problem.

As a result, the water pumping station lost money.

No one mentioned this matter, and Yu Qingyang just clicked on it, and then mainly emphasized the quality.

It is to tell Wan Guoxiang and Huang Debin clearly that it does not matter if you want to pursue profits, but you cannot sacrifice quality.

After the meeting in the conference room, Yu Qingyang went around the construction site again.

The road was not easy to walk, but a dirt road was simply cleared out with an excavator, and some gravel was placed on it, barely enough to ensure the passage of trucks transporting steel pipes.

In this regard, Yu Qingyang did not say anything, which is a characteristic of water conservancy projects.

If the construction road along the pipeline is to be hardened, the project department cannot afford the cost. The measure fee is 1 yuan per kilometer for the construction road, which is only enough to repair such a road.

On the mountain, there are still many places where roads cannot be built at all, and the steel pipes can only be lifted up the mountain by hand.

The pipes connecting the water system are laid and welded from the end.

Along the gravel road, all the way up, more than two kilometers of pipeline welding have been completed.

"We need to find a way to speed up the progress! It's mid-April now, and the rainy season will enter in two months!

You are now laying along the Laoyugou. Once it rains heavily, the Laoyugou may not be able to work for a few days! "

"We are now urging the owners to speed up the relocation work!

Then construct at both ends, rush to the middle! "Wan Guoxiang hurriedly explained.

"Yeah!" Yu Qingyang nodded, "By the way, when did you submit the report on purchasing the micro-tunnel machine?"

"I just handed it over to Mr. Chen yesterday, and I should report to the finance department today!"

"Well, let me ask later, hurry up to approve the funds for you, hurry up to buy machinery, and the connecting tunnel can also be constructed at the same time!" Yu Qingyang nodded with a smile.

In the conference room just now, he was a little puzzled, why he hadn't seen the report on the purchase of the micro-tunnel machine submitted by the project department.

It looks like the finances are being reviewed.

The finance department of Huayu Investment has a very complete management system.

Each subsidiary, each department, and each project department must submit a plan for the use of funds every month.

That is, how much money you will spend next month and where you will use it, you must report it one month in advance and do a pre-examination.

Of course, in order to deal with some emergencies, each subsidiary boss, department head, and project manager has a reserve fund in their hands, which is used first and then reviewed.

In addition, there is another situation, such as the report on the purchase of micro-tunnel machines submitted by the water system connection project.

This is a temporary purchase, and the approval is stricter. Not only the boss of the subsidiary company must sign, but also the head of the audit department, the financial director, and finally Yu Qingyang.

For temporary purchases, the probability of being rejected exceeds 80.00%.

Yu Qingyang asked one more question, because he was afraid that Wan Guoxiang and the others were foolishly waiting for the group to approve funds to purchase machinery, but they didn't know where their report had been rejected.

"Xiao Duan, you can go back to the Finance Department and ask about this matter to see if you have received a report!"

"Thank you, Mr. Yu!" Wan Guoxiang thanked hurriedly.

He knew that if Yu Qingyang's assistant went to ask, there must be no problem with their procurement report.

"Okay, let's stop here today! Overall, it's good, but it needs more work on warehouse management and pipe stacking!
The storage of consumables such as welding rods is a bit messy, and they are piled directly on the ground.

Also, the steel pipes are stacked a little high, which poses a safety hazard!

The project assessment is about to start, that foreigner Zhang Fusheng is not as talkative as I am!
The other places are pretty good. If points are deducted in the warehouse management, your boss Chen is not as simple as cursing!

This assessment is directly related to the allocation of the next project! "Yu Qingyang pointed out the problems existing in the water system connection project department with a smile.

"Yes, Mr. Yu's criticism is correct, we will correct it immediately!" Wan Guoxiang quickly admitted his mistake.

He didn't dare to open his mouth to keep Yu Qingyang for dinner, so Yu Qingyang shook hands with Mayor Zhang to bid farewell, and declined his offer to stay.

Then I ran around several construction sites around the spring.

Although it is just a quick look at the flowers, every construction site, veteran engineer, Yu Qingyang can point out their problems, and every problem can be pointed out, rather than the kind of "you need to strengthen management, strengthen quality management, safety Education" and other stereotypes and empty words.

Let every project department be convinced.

Even Wu Yunfang, who followed Yu Qingyang to inspect, was convinced, and couldn't help feeling that success was never a fluke.

Every construction site can convince a group of project managers in their 40s from the technical level and management level.

This is not something ordinary people can do.

In the evening, Yu Qingyang continued to pick up Xia Xue from get off work, and then went back to the hotel to watch a movie.

…………

The next day, Yu Qingyang signed the purchase report brought by Xue Qin before leading the team to leave the spring.

Depart for Jeju.

The spring water reaches Jeju, and the expressway has already reached Confucius Mansion.

The road from Kongfu to Jeju is not easy to walk, and there are a lot of big cars.

It wasn't until Yanzhou that the road conditions got better.

The scenery outside the car window receded quickly, and Yu Qingyang sat in the back seat, closing his eyes and resting his mind.

Yesterday, I was a little overworked, because I knew that Yu Qingyang was going to Jeju, and then Mudan City, the capital, and he would not see each other for several days, and he was going to Ajigeria at the end of the month, Xia Xue acted a little crazy.

Facts once again proved that there are only exhausted cattle and no plowed land.

The car parked steadily at the entrance of the Canal Hotel.

The Jeju Municipal Party Committee and Municipal Government have prepared a sumptuous lunch and are waiting for Yu Qingyang.

Because we had to work in the afternoon, we didn't drink too much. We only served two bottles of Moutai, and everyone got a glass.

In the afternoon, in the meeting room of the municipal government, a scheduling meeting for the old canal project was held.

It is still the architectural design institute that first reports the design plan for the renovation of the municipal pipe network.

This time, it was finally generous. Not only did it calculate the maximum rainstorm intensity, but the diameter of the pipes was also conservative.

The main network directly selects 2400 three-stage tubes.

Concrete pipes are divided into plain concrete pipes and reinforced concrete pipes.

Reinforced concrete pipes are divided into primary pipes, secondary pipes, and tertiary pipes according to wall thickness, crack load, failure load, and internal water pressure.

Among them, the first-stage pipe has the thinnest wall thickness and the worst pressure bearing, and the third-stage pipe has the thickest wall thickness and the best pressure bearing.

Grade [-], [-], and [-] reinforced concrete pipes can all be used for pipe jacking construction, and the selection of several grades of pipes mainly considers the external pressure, that is, the depth of the covering soil.

The minimum covering depth of the top of the pipe jacking shall not be less than 1.5 times the outer diameter of the pipe jacking.

For jacking pipes with an inner diameter of 2400, you need to choose third-grade superior reinforced concrete.

"Mr. Yu, what's your opinion on the design plan of the Architectural Design Institute?" Zhang Hua asked after the Architectural Design Institute finished reporting.

Yu Qingyang is the main decision maker in this scheduling meeting.

After all, they are not proficient in engineering.

"I have no opinion, only one point, that is, the interface of the concrete pipe, I suggest changing it to an F-shaped steel socket!

For long-distance pipe jacking, the most likely problems are joint dislocation, pipe end damage, pipe joint leakage, pipe wall cracks, pipe wall leakage and other problems.

Compared with the groove and groove, the F-shaped steel socket can effectively protect the pipe end, and has a large force-bearing area, and the interface has a good anti-seepage effect. It is suitable for long-distance pipe jacking, and the applicability of the curved pipe jacking is better than that of the groove. "Yu Qingyang was not polite, and directly pointed out the problems in the plan of the architectural design institute.

"Hehe, Mr. Yu is worthy of being an expert, we have seen the plans of the architectural design institute before, and we didn't find any problems.

Unexpectedly, Mr. Yu saw it at a glance! "Zhang Hua smiled and excused the somewhat embarrassed designer of the architectural design institute.

"I can't talk about experts. When I decided to adopt pipe jacking construction, I specifically searched for information and studied it.

This can be regarded as learning and selling now! "Yu Qingyang said modestly.

"If there are no other problems in the renovation of the municipal pipe network, let the architectural design institute start to deepen the design! Come up with the construction drawings in the shortest possible time!" Seeing that Yu Qingyang had no other opinions, Zhang Hua made a final decision.

(End of this chapter)