Great Power Project

Chapter 449 Water System Connectivity Project

Chapter 449 Water System Connectivity Project (Ask for a monthly pass!)

The car of Yu Qingyang and his party came to the Xingquanhe project department.

Wan Guoxiang, the project manager of the Xingquan River project, has already brought people to stand at the door waiting to be greeted.

Wan Guoxiang is the director of the Sixth Division of Huaihai Engineering Corporation.

Yu Qingyang didn't prohibit him from letting the people below greet him, not because he liked the pomp, but because the domestic environment is like this.

Not allowing the people below to welcome them will cause unnecessary panic and random speculation.

The car was stable, Wan Guoxiang stepped forward to help Yu Qingyang open the door, Yu Qingyang got out of the car and shook hands with Wan Guoxiang.

"Director Wan, brothers have worked hard! I'll come over to see everyone!"

"Thank you, Mr. Yu, for your concern. It's hard work, that's what our water conservancy people do!" Wan Guoxiang was half a head taller than Yu Qingyang, and he was slightly bent to talk to Yu Qingyang.

"Your project department is very impressive! I think all the project departments are the most impressive!" Yu Qingyang looked up at the building that had just been renovated and put into use.

"This is thanks to Mayor Zhang. This is their newly built town government residence. It was just repaired and before it could be used, they lent it to us!" Wan Guoxiang glanced behind him and said with a smile.

The town leaders of Sixteen Mile Mountain were also in the welcoming team.

"Haha, Mayor Zhang, how dare you bother the leader to greet him!" Yu Qingyang laughed and stretched out his hand to shake hands with the coming Mayor Zhang.

"Mr. Yu is a distinguished guest, and also our God of Wealth in Sixteen Miles Mountain. I heard that you are coming, so I specifically told Manager Wan to let us know!" Mayor Zhang held Yu Qingyang's hand with both hands and shook it vigorously.

"Mayor Zhang, I should thank the leaders for their support!
You see, in order to support our engineering construction, all the newly repaired office buildings have been given up!We can't bear this feeling! "

"Mr. Yu, let alone the new office building, it is our old office building. If your company needs it, we can find a way to squeeze out a few more offices!" Mayor Zhang said with a smile on his face.

Not for anything else, just for the concrete mixing station in my jurisdiction, it is worth doing.

There are shares in their town. Looking at the concrete pump trucks that are constantly going back and forth every day, the town has different praises for the original decision.

Mayor Zhang went to the district for a meeting. Who wouldn't envy and hate the leaders of other towns?

That feeling is so cool!

Therefore, when Mayor Zhang found out that Hua Yu Investment's company was coming to construct and look for an office space, he immediately approached senior township officials, and after discussion, he made a decision to lend the new office building to Hua Yu Investment for free.

They can move in a year later, but this kind of love can really earn them.

Mayor Zhang has long been looking forward to Yu Qingyang's inspection of the work, but if Yu Qingyang does not come to inspect the work, how can this favor be implemented?

Now that it was finally implemented, Mayor Zhang smiled very happily.

"Our leaders of Shiliushan Town have deep friendship, and we feel it! I won't say more if we are grateful, and we will have a long life in Japan!" Yu Qingyang expressed his gratitude again.

A group of people walked into the brand new office building.

This office building, it is not appropriate to say that it is a building, the yard is really not small, it has four or five acres of land, the building is not high, only five floors, it is the joint office of the town government and the town party committee.

Domestically, local governments, and general towns and counties, are run by the party committee and the government in a joint office, and only at the city level will they be separated.

Of course, this is not absolute. Some prefectures and cities also have joint offices, and with development, more and more prefecture-level cities have joint offices.

This office building is very modern, with central air-conditioning, marble floors, and a spacious and bright foyer, which is solemn and tidy. There is a line of red characters on the LED display screen. Huaihai Engineering Corporation Quanshui City Wolong Reservoir-Xingquan River Water System Connection Project The lettering on the inside reveals a modern atmosphere.

In 2001, the LEDs in the bad streets of later generations were able to embody modernization.

Walking into the meeting room, all mahogany office furniture in the meeting room.

"Mr. Yu, these are mahogany office furniture produced by our furniture factory.

I originally said that we would provide office furniture, but Mayor Zhang disagreed and insisted on purchasing it ourselves!I asked Mr. Xiao to give me a discount! "Wan Guoxiang said in a low voice.

Yu Qingyang nodded, but did not speak.

The office furniture on the fifth floor will cost several million after the discount.

Otherwise, if the project department provides office furniture, who will take the favor?Some can't tell!

After everyone was seated, Huang Debin, the chief engineer of the project, came to the front and began to report on the work.

Someone nearby turned on the projector, and a map of Nanshan District appeared on the projection cloth.

"First of all, on behalf of the water system connectivity project department, I welcome the leaders of the group company Mr. Yu, Mr. Wu, and the mayor of Zhang to come and guide the work. Next, I will report to you the current tasks of the project department and the progress of the project..."

Yu Qingyang took the lead in applauding.

"Wolongshan Reservoir-Xingquan River Connection Project has a total length of 15.2 kilometers, and the water diversion pipeline uses 600 steel pipes...

It is necessary to build two water pumping stations and open up three mountains...

The difficulty in the construction of this project is the connection of the tunnels of the three mountains, because the geological exploration data given by the design institute are incomplete..."

"Which design institute is it?" Yu Qingyang raised his hand to interrupt Huang Debin and asked.

"Quanshui Water Conservancy Design Institute!"

"You continue!" Yu Qingyang nodded.

"We follow the construction principle of first easy and then difficult, finish the good work first, and then concentrate on dealing with difficult projects..."

"The tunnels of the three mountains are connected, what do you think?"

"We have already issued a report and asked the Quanshui Water Conservancy Survey and Design Institute to give a clear geological survey report!

In addition, we have submitted a report to the company, preparing to introduce micro-tunnel machines for rock mass pipe jacking construction! "Huang Debin glanced at Wan Guoxiang before answering.

"Miniature tunnel machine? Rock mass pipe jacking! You have a good idea!" Yu Qingyang nodded with a smile.

Compared with those road tunnels, railway tunnels, pipeline tunnels in water conservancy are really miniature tunnels.

In this regard, the country is relatively advanced, and the pipeline companies under PetroChina often do this work.

Large-diameter underground rock mass, long-distance pipe jacking, CNPC's technology is very mature, and there is a company under them that specializes in the production of micro-tunnel machines.

The difference between rock mass pipe jacking and soil layer pipe jacking is that the front nose is different.

The micro-tunnel machine used for rock mass pipe jacking is similar to the current shield machine. There is a hob in front of the machine head for rock mass cutting.

When the cutter head of the micro-tunnel machine cuts the rock, the pipe jacking machine pushes the casing and the micro-tunnel machine to move forward, and then the conveyor belt conveys the cut rock fragments.

The Water System Connectivity Project Department is commendable for pushing forward without encountering difficulties, let alone adopting the most common method, subcontracting.

Instead, I am going to buy equipment, learn technology, and gnaw this hard bone by myself.

This is the most commendable place!
It saves you trouble and worry by outsourcing everything, but what do I want you to do?
Why do I support so many companies?I have a construction company as the general contractor. How easy is it to subcontract the project?

Outsourcing, and self-research and self-construction are two concepts. After you outsource, you are only responsible for supervision, which is completely different from doing it yourself and finally mastering the technology.

It's like, never worked as a construction supervisor, no matter how many projects you supervise, no matter how proficient you are in memorizing the specifications, the specific construction operations are not as good as those young construction workers who have only worked on one or two construction sites.

We often say that the most feared thing on the construction site is not the supervision to do construction, but the transition from construction to supervision.

That's the reason. Those who stand and watch, no matter how much they watch, are superficial. It's better to bend down and do it once to understand more after watching ten times.

Once the bent over work stands up to watch, it is definitely a nightmare for other bent over workers.

"Do you still have any difficulties?"

"The difficulty is relocation, which has seriously restricted our construction progress!"

It's an old question, and it's a commonplace one.

For almost all projects, the first problem encountered is relocation.

Yu Qingyang turned to look at Mayor Zhang.

"Mr. Huang, is there any obstacle to the construction on our side of Sixteen Mile Mountain?

In the afternoon, I will call the secretaries and directors of the relevant villages, and let's study it together! "Mayor Zhang naturally understood what Yu Qingyang's eyes meant, and said immediately.

"Thank you for the support of the leaders! We have basically solved the problem here in Shililili Mountain, but there are two orchards in Liujiawopu and Zhaojiayu, which have not been solved yet!

The main problem is concentrated in Zhongnan Town, where there are twelve orchards, three cemeteries, and six houses obstructing the construction! "Wan Guoxiang quickly asked Mayor Zhang to explain.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like