Great Power Project

Chapter 312 Inspecting the Construction Site

Chapter 312 Inspecting the Construction Site (Ask for a Monthly Ticket!)
The Xiaoqing River originates from the Yufu River, branch streams, and many springs in Quanshui City. The northeast stream flows through mountainous areas, Zhangqiu, Boxing and other counties, and enters Laizhou Bay 20 kilometers east of Yangjiaogou in Shouguang County.

It has a total length of more than 240 kilometers and a drainage area of ​​1.1 square kilometers.

It is the only flood control and sewage drainage channel in the main urban area of ​​the provincial capital.

With the development of the city, the pressure of flood control and drainage in the urban area of ​​Xiaoqinghe Spring is gradually increasing.

Due to a large amount of industrial sewage and domestic waste water being discharged into the Xiaoqing River, the water pollution has become more and more serious, and the fish and shrimp in the river have almost disappeared.

This further leads to the deterioration of the surrounding environment, which seriously restricts the economic and social development of Quanshui City, especially the northern urban area.

In the spirit of the meeting instructions led by the provincial party committee, Quanshui City carried out comprehensive treatment of the spring water section of Xiaoqing River.

The construction site is mainly in Lishan District, with a total length of 31 kilometers.

The first phase of the project has a total investment of 40 billion.

Naturally, not all of the 40 billion will be used for dredging and reinforcing embankments.

The whole project includes flood control, urban drainage, sewage interception and pollution control, road bridge, pipeline reconstruction, river water replenishment, landscape construction and cross-strait development, etc.

The comprehensive management of the Xiaoqing River actually started in [-].

The bidding section undertaken by Huaihai Engineering Corporation is only a bidding section of the river channel part of the first phase of the Xiaoqing River Comprehensive Treatment Project, which is not only for flood control and waterlogging, but also for landscape construction.

To put it bluntly, it is actually dredging, reinforcing the embankment, and then greening both sides of the river.

It is similar to the project content of Niutouyu Donggou.

When Yu Qingyang arrived, Chen Yongfa was already waiting at the intersection with the company's leaders and people from the project department.

"Old Chen, you came very quickly!" Yu Qingyang got out of the car and shook hands with Chen Yongfa.

It is much farther from the company to the Xiaoqinghe construction site than from Niutouyu Donggou to the Xiaoqinghe construction site.

"It happened that I came to Xiaoqinghe construction site today to check the situation. When Lao Guan called me, I was already halfway!" Chen Yongfa explained with a smile.

"Hehe! That's really a coincidence! I also wanted to come over to see the situation!

This is the first project of over [-] million yuan undertaken by our Huaihai Company! "Yu Qingyang laughed.

As for whether Chen Yongfa was coming to inspect it, coincidentally, no one bothered about it.

Yu Qingyang shook hands with Vice President Shan Heyu, Zhang Jianguo, Chief Engineer Meng Zhihui, and members of the project department.

The project manager of the Xiaoqing River comprehensive management project is the deputy general manager Zhang Jianguo.

The Xiaoqinghe project department transferred staff from two engineering offices and half of the staff from the technical office.

"Let's go, first go to your project department to have a look!"

"Mr. Yu, follow my car, and I will lead the way!"

"Okay!" Yu Qingyang nodded, turned and got into the car.

Follow Chen Yongfa to Xiaoqinghe project department.

Xiaoqinghe project department is much better than Niutouyu.

It is also a rented private house, but this private house is very large and spacious.

The yard alone occupies an area of ​​more than one mu. The three-story building, plus two two-story annexes in the east and west, has a total of more than 60 rooms.

The exterior wall is covered with dark golden wall tiles and matched with a big red wooden door, giving it a resplendent and resplendent feeling.

Spring water has never been short of local tyrants.

"Mr. Yu, this is a nursing home donated to the village by a rich man in Panzhuang.

As a result, the house was built, and the rich man suddenly ran away.

It is said that it was illegal fundraising, and the donations absconded.

This nursing home was put on hold because of debt disputes! Seeing Yu Qingyang looking at the yard in a daze, Chen Yongfa explained the history of the yard to him in a low voice.

Yu Qingyang nodded with emotion.

Around 2000, I don’t know how many families were harmed by illegal fund-raising.

In a word, it is still greed.

In the previous life, Yu Qingyang was cheated of more than 5 yuan, which directly led to the breakdown of his first marriage.

Walking into the meeting room, it was originally designed as an activity room for the elderly.

It is now a meeting room.

“我们公司的施工范围,是K25+100-K29+000,总长3.公里。

The main project content is the river channel water conservancy project and the construction of hidden culverts for the South-to-North Water Diversion Project, the reconstruction of municipal roads, bridges and pipelines..." Chief Engineer Meng Volunteer introduced the project summary to Yu Qingyang.

"I know all of this!

Tell me about the specific construction arrangements and the current construction progress! "Yu Qingyang interrupted Meng Zhizhi's words.

"Okay Mr. Yu, we are taking advantage of the favorable conditions of the dry season to construct the river works on the left and right banks at the same time.

We divide the right bank into two sections and carry out the construction first, the excavation of the earth above the elevation of +20.0 and the demolition of the existing masonry bank wall.

At the same time, build island cofferdams and set up deep water wells for precipitation.

After the precipitation effect meets the requirements, the earthwork excavation of the new bank wall and the bank wall construction will be carried out.

The excavation of the channel expansion on the left bank was carried out in three sections at the same time, all of which were constructed by subdivision and layered excavation.

Firstly, excavate 4 meters deep along the existing river bank wall area B as a mud storage pit, dig out the silt on the left side of the river, store it, and transport it outside after seepage.

After the silt is transported, the stone masonry wall on the left bank will be demolished, and at the same time, it will be divided from right to left according to the 8-meter-wide standard, and excavated and transported in layers...

The existing river channel secondary bank wall is retained as a cofferdam retaining wall, and the new channel formed by the expansion and excavation of the left bank is used as a construction diversion channel for secondary dredging.

The water lifting well and the cleaning port will be arranged in a timely manner according to the construction progress..."

Yu Qingyang understood that what Meng Zhizhi said was divided into two stages and three stages, actually referred to two construction teams on the right bank and three construction teams on the left bank.

The Xiaoqing River comprehensive treatment project is the largest project in Dongshan Province since the founding of the People's Republic of China, and there are supporting projects related to the South-to-North Water Diversion Project.

Naturally attracted a lot of attention.

Although Huaihai Engineering Corporation won the bid, no fewer than 100 people greeted it from top to bottom.

Leaders within the system, leaders outside the system, local leaders, and village leaders.

Everyone wanted a piece of the pie.

"What's the current construction progress?"

"The layout of the precipitation wells has been completed, and the precipitation wells are being drilled and the construction roads are being repaired." Zhang Jianguo replied.

"Is there any difficulty?"

"The main reason is the lack of construction machinery. Although there are many leaders saying hello, there are more manual work and less machinery.

Mr. Tang transferred five excavators from his side. In addition to the local ones, there are only ten excavators and fifty dump trucks, and thirty of them are Dongfeng dump trucks.

The excavation volume of earthwork in our bidding section is 220 million cubic meters, of which 180 million cubic meters need to be shipped out!
The current transportation capacity is simply not enough to ensure that the earthwork construction will be completed before the flood season. "

"This is a practical problem!" Yu Qingyang nodded.

This year, the total investment in water conservancy projects in Dongshan Province alone has reached more than 100 billion.

Everywhere is engaged in urban construction, building roads, building buildings, and construction machinery is inevitable.

This situation will not be alleviated until next year.

Yu Qingyang rented the excavator to the Provincial Water Administration. After the Hongwei River was finished, he didn't put the car at all, and transferred it directly to the Xiaoqing River.

For this reason, Mr. Lu made all the phone calls abroad, and Yu Qingyang couldn't refute his face.

"I'll turn around and ask, see if Mr. Tang can still get the excavator out!

If it doesn't work, go buy a new machine! "

This is the first project of over [-] million yuan undertaken by Huaihai Engineering Corporation, and Yu Qingyang also attaches great importance to it.

It is necessary to let the leaders of the department see the working ability of Huaihai Engineering Corporation.

"Are there any other difficulties?"

"The other thing is local relations. We are coordinating!" Zhang Jianguo said after thinking for a while.

"Well, Mr. Chen, let's go to the scene together?" Yu Qingyang looked at Chen Yongfa.

As for the local relationship Zhang Jianguo mentioned, Yu Qingyang didn't ask much.

The handling of local relations is something that every project manager must go through, and it is also a hurdle to test the ability of the project manager.

As the vice president of the company, if Zhang Jianguo couldn't even handle this, then Yu Qingyang should think about whether Zhang Jianguo is capable of serving as the vice president of Huaihai Engineering Corporation.

Chen Yongfa and other leaders of Huaihai Company accompanied Yu Qingyang to the construction site.

If you don’t consider the pungent black water in the river, the scenery of Xiaoqing River is still very good, and the trees on both sides are shady, which is a good place for leisure.

It's a pity that now you can't see groups of fish and shrimps, groups of ducks playing in the river, and the river water is crystal clear.

Only the black river water and the big trees on the bank remained.

Ten excavators are repairing access roads and digging deep pits for storing silt.

Because the water content of the sludge is relatively large, it is not convenient for direct transportation, so it must be dehydrated first.

Dig deep pits on the river bank to store silt and let the water in the silt seep naturally into the soil.

This is a relatively stupid and primitive construction technology.

Even the most primitive and stupid construction technology is much better than the rough method of directly transporting away from Niutouyudonggou.

Of course, Niutouyu Donggou has its special reasons.

There is no condition to dig a deep pit to control the water of the silt.

That's why Yu Qingyang didn't criticize Huayu First Construction Group's simple and rude construction methods.

Fortunately, in 2000, environmental inspections were lax.

If it is placed in later generations, the construction method of Huayu First Construction Group can be directly pulled down from the blacklist.

"Mr. Chen, there are too few safety warning signs on site, and there are too few publicity signs about the company's image." Yu Qingyang simply asked a small question.

"In the future, we will set up warning signs and corporate image promotion signs!" Chen Yongfa breathed a sigh of relief.

Regarding Yu Qingyang's sudden visit to the construction site for inspection, Huaihai Engineering Corporation was worried from top to bottom.

This is the first project received by Huaihai Engineering Corporation after investing in Huayu.

It was also the first project he undertook after Chen Yongfa came to the company.

In addition, he was not familiar with Yu Qingyang, he didn't know Yu Qingyang's personality, and he was afraid that what he did not do well would make Yu Qingyang dissatisfied.

Seeing that Yu Qingyang only asked a small question, everyone naturally breathed a sigh of relief.

"Hehe! Old Chen, are you relieved now?

Are you worried that I will come over and find fault with you? "Yu Qingyang glanced at Chen Yongfa and asked with a smile.

"This... Mr. Yu is doing us good by asking us!

We hope that Yu can always point out some deficiencies to us. "Chen Yongfa was taken aback for a moment, he didn't expect Yu Qingyang to speak so directly, and then laughed along with him.

"There are many problems, but this is not mentioned here!
The group company will have a meeting tomorrow, let's discuss together! "

Yu Qingyang's words made Chen Yongfa and others' hearts rise again.

Group meeting to discuss?
Chen Yongfa, Zhang Jianguo and others were all using their brains, thinking about any major problems on the construction site, which needed to be discussed at the group meeting.

"Don't think about it! What we will discuss tomorrow is not an individual phenomenon at that construction site.

It is some common problems that exist in the entire industry! Seeing Chen Yongfa, Zhang Jianguo and others frowning and thinking hard, Yu Qingyang laughed.

Yu Qingyang's words made Chen Yongfa and others wryly smile and slander endlessly.

Halfway through talking, it really scares people to death.

At noon, Yu Qingyang had a working meal with everyone in the Xiaoqinghe project department.

Originally, Chen Yongfa planned to invite Yu Qingyang to the restaurant.

It was rejected by Yu Qingyang.

"Your food is not bad! The chef's level is also good, this tile fish stew is delicious."

"Our food standard is seven yuan per person per day. There are many people on the construction site here, and all the food is relatively good.

You can eat fish or ribs or braised pork once a week.

The chef was found locally. When the production team used to be, they used to cook big pots of rice. "Zhang Jianguo explained carefully.

"It's still delicious to eat in this big pot! This tile fish has to be stewed in a ground pot so that the taste can penetrate into the meat!" Yu Qingyang smiled and didn't say much.

He knew that Zhang Jianguo was suspicious.

I didn't explain too much. Sometimes the more you explain, the more people think.

After eating, Yu Qingyang was ready to go back home.

Two vans drove into the project department.

There are seven or eight young people who are not like good people.

His hair was dyed yellow, and he wore a gold chain around his neck.

As soon as I got out of the car, I shouted: "Who is the boss?"

"I'm the manager of the construction site. Do you have something to do?" Yu Qingyang didn't speak, but glanced at Zhang Jianguo, who went up to him and asked.

"You guys are working here, who did you say hello to?" the yellow-haired leader asked arrogantly.

"Say hello? The comprehensive treatment of the Xiaoqing River is a key project in the province. We are a subsidiary company of the Water Resources Department.

I don't know, who do we need to greet when we are working? "

"I don't care if you are the Department of Water Resources or the Department of Highways.

This area is under our Brother Long's management.

You work, you want to say hello to our brother Long. "Huang Mao looked sideways at Zhang Jianguo and said.

"We really don't know Brother Long, so we don't know what you mean by Brother Long?"

"Who doesn't know our Brother Long in Linyuan Town?

I'll give you two days, hurry up and report to Brother Long!

Otherwise, if there is a problem on the construction site, don't blame us for not reminding you!
Walk! After Huang Mao finished speaking, he turned around and got in the car to leave.

It's really crisp and neat.

But after hearing Huang Mao's words, Yu Qingyang also knew that that Brother Long was not a big character.

It is estimated that they are local snakes, street gangsters and the like.

The score is not small.

Send a few punks over to threaten them, and then ask the project department to report to them.

However, such a role is also the most difficult.

Like the boss Zhang before, he is a big gangster, and he is more disciplined in his work.

Moreover, it is in the stage of whitewashing, so it is easier to deal with it.

A little gangster like Brother Long is not afraid of the sky or the earth. He only has one purpose, to ask for money.

If you don't give me money, I will make trouble for you.

The most difficult thing to deal with is not enough to be a crime. Even if you call the police and you are caught, at most you will be detained by public security.

Looking back, I will still make trouble for you, making it impossible for you to work normally.

 Returning to the construction site was an hour and a half late.

  When I arrived at the construction site, I found out that I forgot to bring the dormitory key!

  Bitter!The temperature is more than 20 degrees at noon and about ten degrees at night.

  I found a hotel to stay in, and went back to the company tomorrow to get a spare key.

  
 
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like