Life in the world of film and television

Chapter 460 Building Renovation Plan

Chapter 460 Building Renovation Plan

The next day, accompanied by an intermediary, Li Mu visited the 36-story building.

It is indeed quite good, with a total of 36 floors, three floors underground, and 33 floors above ground. The total height of the building exceeds 100 meters.This height fully meets the requirements, and even if the sea water in Yunshi floods back, it can persist for several years.

In terms of construction quality, as the agent said, it is rare and good.It is said that the chairman of this group company is from Tangshan, and he is very concerned about this aspect.

"Mr. Li, what do you think?" the intermediary said.

Li Mu nodded and said, "Yes, we can talk!"

The agent was overjoyed: "Alright, I'll arrange a time to meet and talk together."

.........

When he got home that day, Li Mu was not idle. He first found an agency company and spent a little more money to let them quickly register a Muwu Co., Ltd. for him.

Later, they contacted well-known consulting companies, accounting firms, and law firms in the city to form a negotiation and acquisition team to carry out the negotiation and acquisition of the building in the name of Muwu Company.

Li Mu was not idle either. To acquire a building requires a huge sum of money, so he began to cash out the stocks.

More than a month ago, Li Mu looked at the opportunity, mobilized 12 million funds, and doubled the leverage, a total of [-] billion funds, to build positions in the stocks of solar photovoltaic and generator manufacturers.

For more than a month, due to the rising temperature, many places have begun to limit power and blackouts, and the market demand for solar photovoltaics and generators is increasing.

Sometimes, you can't even buy it.

With such a huge demand, the business and profits of related companies began to skyrocket. Numerous investment institutions and dealers began to operate in the market, and the stocks of solar photovoltaic and generator related companies began to rise steadily.

In just over a month, the book value of Li Mu's 12 billion worth of stocks has increased by five or six times, and the book value of the stocks now exceeds 60 billion.

Although the temperature has dropped a lot due to the heavy rain a few days ago, the temperature has begun to slowly increase in recent days.

Chinese people are the most sensitive and the easiest to learn lessons. Although the temperature has not returned to the situation before the rain, many people have started to worry again. The demand for solar photovoltaics and generators has not decreased at all.

These behaviors have caused the stocks of solar photovoltaic and generator-related companies to continue to rise, with a large amount of new funds pouring in every day, and there is no downward momentum at all.

This was convenient for Li Mu, and it took two days to cash out all the stocks.The leveraged funds were returned, and the interest paid was still 58 billion.

These funds, in addition to the 55 million left on hand, the remaining 55 billion were all injected into the newly registered Muwu Co., Ltd., so that the company's registered capital directly reached [-] billion, all of which were actually paid.

The acquisition of the building was carried out very quickly. The acquisition team offered a price of 13 billion, and the other party asked for a price of 17 billion. After two days of negotiations.The acquisition team raised the offer to 14 billion, and the other side also lowered the offer to 16 billion.

Next, it seems that we will continue to grind the price.

Li Mu couldn't wait any longer. The most important thing for him now was time. He directly offered the conditions, bought it in full at a price of 15 billion, signed the contract, and went to the bank immediately.

These days, cash is king, and there are not many who can directly pay the full price for the acquisition.In fact, there are quite a few companies interested in this building, and none of them paid in full, either wanting to use the building that has not yet been acquired as a mortgage to pay, or to pay in installments.

In comparison, Li Mu is refreshing enough.

In the end, Muwu Company purchased the building at a price of 15 billion, and Li Mu changed its name to Muwu Building.

With the mansion in hand, the remodeling work of the villa has been completed. Li Mu then found a well-known furnishing company to be in charge of the furnishing work of the villa, and put his mind on the Muwu Mansion.

The next step is the renovation of the Muwu Building, transforming the building into a survival base in the high-temperature end times.

This is a big project, among other things, just the heat insulation project of the whole building will cost no less than [-] million yuan.

It has made countless decoration companies jealous.

However, Li Mu's conditions were very harsh.It's not that the price is low, on the contrary, the money is very generous, which is [-] to [-]% higher than the price of similar projects.

It is really that the construction period given by Li Mu is too short. The construction period of such a building is only three months for the heatstroke prevention, temperature avoidance, and heat insulation projects.

Usually, such a large project usually takes half a year, or even half a year.

In addition, the requirements for the quality of the project are extremely high, and the materials are all the highest-grade fire-proof and heat-insulating materials, and even some important places are made of aerospace-specific heat-insulating materials, which can withstand high temperatures of hundreds to thousands of degrees.

The supervision is also very strict, and many well-known engineering supervision and testing agencies have been hired. If there is a quality problem, not only a large sum of money will be lost, but also a lawsuit will be filed.

With so many demanding requirements, even if the project makes money, without diamonds, who would dare to take on the porcelain work.

On the contrary, the decoration company responsible for heat-proof and heat-insulating renovations for Li Mu's villa is the most willing.They were also afraid that they might have missed something or delayed the construction period, so they teamed up with a decoration company from other places with the same strength to undertake the renovation project of the building's heat protection and heat insulation.

In order to allow them to speed up the construction, Li Mu also drew a big cake for them. Based on the standard of three months, if the construction is completed one day earlier, they will be rewarded with 200 million.If the project can be completed one month ahead of schedule, an additional reward of 6000 million can be obtained, which is more than the annual profits of the two decoration companies.

Such favorable conditions made the two decoration companies completely envious, and dispatched a large number of manpower at one time to work on more sites and at the same time.

In addition to the heat insulation project, there is still a lot of work waiting for him to do in the whole building.

For example, the functional division of each floor, and space arrangements.

First of all, there must be no shortage of fitness and entertainment facilities. With the high temperature outside in the future, fitness can only be placed indoors, and fitness and exercise facilities must be complete; similarly, in the end of the high temperature, the outside entertainment facilities are basically useless, but you should enjoy it or enjoy it, not so much It is a boring waste of time, entertainment facilities must also be available.

In this regard, Li Mu has also made arrangements. The 31st floor of the building will be planned as a fitness training center.With an area of ​​[-] square meters on a single floor of the building, and a fitness club of [-] square meters, it would definitely be top-notch in Yunshi.

After the establishment of Muwu Company, the registered capital was as high as 55 billion, which means that it is impossible to become a leather bag company.During this period, through headhunting, a few people were also recruited, and the company's simple airs were set up.

For some tasks, he does not need to do it himself, and someone else will finish it after ordering it.Regarding the decoration and construction work of the fitness center, a professional company will soon follow.

The construction period is also three months, and the best materials and quality are used to build, and there are rewards for early completion.

The entertainment center is arranged above the fitness center, on the second floor of No.30.

Li Mu plans to build a place for leisure, entertainment and relaxation in this [-]-square-meter area.

For example, set aside an area of ​​3 to [-] square meters to build a small and medium-sized library; set aside an area of ​​[-] to [-] square meters to build a private [-]D theater;

Designate an area of ​​two to three hundred square meters and build a small bar; designate an area of ​​hundreds of square meters and build a VR virtual game center; designate an area of ​​one or two hundred square meters and build a coffee shop...

In short, the entire 32 floors and [-] square meters will be built into leisure and entertainment facilities.

The project on this floor was contracted to three professional companies, and they were given a construction period of two and a half months, and rewards were given for early completion.

Li Mu's residence is on the 33rd floor, and a luxury house decoration design team was specially invited to build the 33rd floor as a super large flat.

Li Mu, his nanny and housekeeping staff will all live on this floor.

The construction period was also given three months, and there were rewards for early completion.

In addition, considering the high temperature outside, it is definitely impossible to obtain vegetables from the outside world. Li Mu began to think about choosing a floor to build an indoor greenhouse vegetable cultivation base.

This is actually quite simple. There are mature technologies and professional teams in China.

Li Mu reserved the tenth floor of the building, and invited a well-known domestic professional team to design and build this indoor greenhouse vegetable cultivation base.

The total area is [-] square meters, which is equivalent to more than [-] mu of land. If it is carefully managed, the yield is quite considerable, and there will be no shortage of fresh vegetables in the next few years.

Not only that, on the first, second and third floors of the building, Li Mu also hired a specialized company to carry out a large-scale reinforcement project to deal with possible floods in the future.

At the same time, Li Mu drilled three pressurized wells with a depth of hundreds of meters on the third underground floor of the building, which was also the lowest floor, and installed a special water pump to connect with the water supply system of the building.

Even if the water in Yunshi stops in the future, it will not have any impact. If you start the pump, a steady stream of water will be pumped up from the ground.

Moreover, the water pump used is amphibious, it can pump water on land, and it can also work in water, which is similar to the submersible pump used in rural areas for watering.

Even if the basement is flooded in the future, it will not affect the normal operation of these pumps.

The 35th floor of the building is a water room specially planned by Li Mu. Not only has a large-scale groundwater purification system been built to fully purify the groundwater pumped up by the water pump.

At the same time, a large-scale water storage system was built on the 35th floor, which can store thousands of tons of water. Even if the water stops, it can maintain a long-term domestic water supply.

Of course, all of the above needs sufficient power support and supply. If the power is gone, no matter how well prepared it is, it will be useless.

In the future, it is foreseeable that with the arrival of high temperature and the end of the world, the power system will have problems sooner or later.

At this time, the easiest and most cost-effective way is to install photovoltaic solar energy. The hot sun in the future will be the best energy source.

Li Mu plans to install solar panels on the entire roof, covering an area of ​​[-] square meters.Not only that, but he heard that the new technology released some time ago is also a new product. Solar panels can be pasted on the wall like tiles or glass curtain walls and used as the outer wall of the building.

Just like Han tiles, replacing roof tiles with photovoltaic solar energy.

Li Mu also wants to use this new product on the Muwu Building, covering all the walls of the building that can be illuminated by sunlight with photovoltaic solar energy.

In fact, in the future, compared with other power generation methods, using photovoltaic solar energy is really fragrant.

Li Mu checked the information on the Internet. Ordinary photovoltaic solar energy, in the case of good sunlight, has a power generation efficiency of 150 watts per square meter, which is equivalent to a month. One square meter of solar panels can generate 0.5 degrees of electricity, and generate [-] degrees per day. electricity.

It seems not much, but the power generation efficiency is already very powerful compared with diesel and gasoline generators.

Li Mu installed [-] square meters of photovoltaic solar panels on the roof, plus solar panels installed on several walls of the building, at least [-] to [-] square meters.

According to the photovoltaic solar energy per square meter, the power generation is [-] degrees a day, even if there is only [-] square meters of photovoltaic solar energy, it can generate [-] degrees a day.

Li Mu's demand for electricity is not large. In the future, the electricity generated by photovoltaic solar energy alone may not be used up.

Considering that photovoltaic solar energy cannot work on cloudy days and at night, and there is no power supply, Li Mu began to consider building a special power storage system.

In the future, the weather will be cloudy and sunny, day and night, and solar energy cannot generate electricity in real time. It will be much more convenient to store the excess electricity generated during the day.

Whether it is cloudy or dark, there is electricity available.

Therefore, another tens of millions was spent to build seven or eight sets of power storage systems on the No.12 floor, each of which can store tens of thousands of kilowatt-hours of electricity.

Under normal circumstances, the electricity generated by the solar energy can completely meet the electricity demand of the building.

However, in order to prevent accidents, on the No.12 floor, Li Mu has equipped five sets of large-scale diesel generator sets to deal with possible unexpected situations in the future.

As it happens, seven or eight sets of power storage systems, together with the cooling system, occupy thousands of square meters; five sets of large diesel generator sets also occupy hundreds of square meters.

Coupled with the transformer, the building's power control system, although looser, just occupies an entire floor.

In addition, in order to store some meat and keep fresh and frozen food in the future, Li Mu built a cold storage of more than 1000 square meters on the eleventh floor. fresh storage.

In the future, meat, fish... those that need to be preserved for a long time should be put into cold storage.Vegetables, fruits, fresh... including meat, fish, those that need to be kept fresh for a short period of time, should be placed in the fresh-keeping warehouse.

On the other hand, considering the high temperature weather in the future, whether it is a building or photovoltaic solar energy, it is inevitable to enter a high temperature state when exposed to the scorching sun.

If the temperature reaches a certain level, it will not only damage the photovoltaic solar energy, but even if there is a thermal insulation layer in the Muwu Building, the interior will be affected by the high temperature.

In this regard, Li Mu plans to directly cool down the photovoltaic solar energy and the building from the outside.

It sounds complicated, but it is actually quite simple. It is to install a batch of automatic sprinkler systems, such as installing a batch of photovoltaics on the roof of the building, covering an entire roof of [-] square meters.

A batch can also be installed on the wall of the building.For example, every five floors, around the outer wall of the building, install a batch of automatic sprinkler systems.

The amount of sprayed water does not need to be too large, just a drizzle, if from the roof to all the outer walls of the building, 24 hours of uninterrupted spraying of water to cool down.

Even if there is a high temperature in the future, the temperature will be taken away by the sprayed water into water vapor. Whether it is photovoltaic or the wall of the building, it can maintain a reasonable temperature.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like