Tokyo Barrister: Start the law firm bankruptcy

Chapter 213 Surveying and Mapping Methods

Chapter 213 Surveying and Mapping Methods
"Plaintiff's lawyer, you asked a very good question." Gu Meimen strolled to the middle of the court, turned around and pressed the remote control in her hand.The whiteboard over the dock immediately projected a satellite image.On the satellite map, it shows the bird's-eye view of the General Hotel.On this satellite image, 37 red dots are also marked.

Gu Meimen smiled slightly, "The following is to clarify the plaintiff's lawyer's question about the actual construction site of the hotel column. The defendant presented the second evidence-satellite survey map. The satellite survey map was drawn by Hengliang Survey and Mapping Co., Ltd. After surveying and mapping personnel The on-site confirmation of the hotel's pillars, through the placement of sensors, transmits the position signals of the pillars to the satellite, and finally marks them in the photographed map. Now the scale of the satellite image has been enlarged to be the same as the scale of the land boundary reconstruction map."

The next moment, Gu Meimen pressed the button in her hand again.All I could see was the geographic map and satellite map on the projector, and the two electronic scans became faded, and began to slowly approach each other, gradually overlapping each other.The 37 red dots in each of the two pictures, that is, the positions of the 37 pillars, are constantly approaching each other.

When the boundary map and the satellite image are completely overlapped, whether the 37 red dots in the two maps also completely overlap each other will completely reveal the truth of whether the hotel construction is actually carried out according to the boundary map.

All the people present could not help but hold their breath, staring closely at the projection whiteboard over the dock.If they can really overlap each other completely, then there is nothing wrong with the hotel side.

At this moment, the time seems to be extremely long.The constantly intertwined land boundary maps and satellite images first became messy, and the interlaced land boundary and satellite photos instantly made the projected images on the whiteboard messy and difficult to recognize.However, as the areas overlapping with each other become larger and larger, the lines and boundaries that were obscured gradually become clear again, and the familiar outline of the boundaries reappears.Until the end, the boundary map and the satellite image were completely overlapped.

At the moment when the two pictures overlap, the 37 red dots overlap completely without any offset.The intersection of red dots is like 37 stars shining in the courtroom in the vast night sky.

The actual positions of the 37 pillars are exactly the same as the planned construction positions on the land boundary reconstruction map.

The construction of the hotel is carried out in full accordance with the land boundary recovery map issued by the land registration.

The actual construction site has not been changed!
The audience in the auditorium suddenly became restless. With a "bang", Shimada sat in the crowd, his face pale, and the phone slid directly to the ground, making a crisp sound.He was already frozen in place, at a loss, as if he couldn't accept the fact that happened in front of him.

Taking advantage of the victory, Gu Meimen pursued, took a step forward, and pressed the remote control again with her finger, "Now the defendant will present the third piece of evidence."

But on the whiteboard, a form was projected.The title of the form was printed in large characters, "Methods of Land Boundary Surveying and Mapping".The densely packed seven or eight lines below are printed with various surveying and mapping techniques.The name of the specific technology is written on the left side of the table, and the middle column of the table shows the simple process of the surveying and mapping method.The rightmost column of the form is accompanied by photos of the surveying and mapping process, allowing viewers to more directly understand the site conditions of different surveying and mapping methods.

Gu Meimen looked back at the whiteboard and said, "This information is to prove that the use of different land boundary surveying and mapping methods will lead to different land boundary measurement results. Chief referee, we can clearly see from the table that there are many methods of land boundary surveying and mapping. Various. There are triangulation, trilateration, traverse measurement, intersection measurement, satellite positioning measurement, free station method, household-ground aerial photography, aerial triangulation, etc. At the same time, there are various measuring instruments, such as flat panel, Theodolite, GPS receiver, GPS satellite locator, etc.

"The application of different surveying and mapping methods will have an impact on the specific shape of the land boundary. We can easily understand that in the early days of the era, when the surveying and mapping methods were not mature, it is not surprising that there were errors in the land boundary measurement."

Gu Meimen then looked to the other side of the whiteboard, "The first piece of evidence presented by the defendant just now included five land boundary restoration maps. Among them, the first land boundary restoration map was made 31 years ago, using the traditional The triangulation method was used to draw the demarcation conclusion that the two square meters of land occupied by the column involved in the case is within the boundary of the plaintiff’s father.”

"The second map of land boundaries, which is the one highlighted by the defendant's representative just now, uses aerial photography to delineate the two square meters of land involved in the case under the defendant's name."

"The third land boundary restoration map was made 16 years ago, using the wire survey method, and re-drawing the two square meters of land involved in the case under the name of the plaintiff's father."

"The fourth land boundary map was drawn nine years ago, using the satellite positioning measurement method. At this time, the land boundary map shows that the land involved in the case is under the name of the defendant hotel.

"The five land boundary restoration maps used the intersecting measurement method. At this time, the restoration pattern put the two square meters of land involved in the case under the name of the plaintiff's father."

"Judging from the above five land boundary restorations, the two square meters of land occupied by the pillars of the General Hotel will actually fall on the boundaries of different property owners due to changes in surveying and mapping techniques. If we take Gaojing The land of the General Hotel and the land of the Jiangjun Hotel, and the entire adjacent land boundary, in addition to the two square meters of land involved in the case, there are other small plots, which are sometimes classified under the name of Gao Jing and sometimes under the name of the hotel.”

The corners of Gu Meimen's mouth turned up slightly again, "We can actually see that when the traditional wire survey method is used, the land involved in the case will often be assigned to the name of the plaintiff's father. When using the positioning method, the plot of land involved in the case will be assigned to the defendant’s hotel in the re-examination of the land boundary.”

"That is to say, when more accurate and advanced surveying and mapping methods are used, the disputed land parcels involved in the case will be included in the name of the hotel. However, in terms of relatively traditional surveying and mapping methods, the disputed land parcels will be assigned to Gaojing Under such circumstances, the attorney for the defendant believes that the demarcation conclusion should be based on the more advanced surveying and mapping methods of the times. The conclusion is used as the basis. According to the second and fourth land boundary restorations, the two square meters of land involved in the case were allocated under the name of the defendant hotel, so it should be considered that there was no illegal construction in the hotel’s construction, and its behavior did not constitute infringement.”

In the blink of an eye, the lawyer with a 100% winning rate resorted to the vicious second trick.That is to say, based on the advanced nature of the surveying and mapping method to attack the conclusion in favor of the plaintiff.Adding up the previous first trick, that is, the hotel is based on the legal point of view of the restoration conclusion made by the land registration before proceeding with the construction.The combination of the two moves is like a sharp magic weapon, which almost cuts the plaintiff's claim for exclusion of nuisance into pieces.

Miyagawa froze in place, opened his mouth slightly, unable to say anything.The evidence preparation on the other side is too sufficient.If it is ordinary evidence that is usually submitted, maybe the lawyer still has room to react, but now Gu Meimen's evidence involves professional surveying and mapping methods, and there is no way to refute it without prior preparation.

Even so, Miyagawa still stood in front, clenched his fists tightly, showing an appearance of unwillingness to admit defeat.

Gu Meimen looked at the scene in front of her with a smile, then turned her head to look at the judging seat, "Chief referee, I have a proposal. According to the land boundary reconstruction map many times before, there are many small plots, sometimes included in the hotel, sometimes It was placed under the name of Gao Jing."

"In the fourth satellite survey, about 3.92 square meters of the hotel's land was assigned to the plaintiff Gao Jing. About 2 square meters of Gao Jing's land was assigned to the hotel. In the spirit of good neighborliness, We might as well simply replace the land. The hotel renounces the ownership claim of 3.92 square meters under the name of Gao Jing. The plaintiff Gao Jing renounces the ownership claim of 2 square meters of land. In this way, everyone is happy with the settlement of the dispute. The plaintiff Gao Jing’s land area There’s also an increase of 1.92sqm, which is a win-win situation.”

The land swap proposal was thrown to court.

Anyone with a discerning eye already knows that once the land is replaced, the land occupied by the big column will be included in the name of the hotel.The plaintiff Gao Jing will also lose the right to request the hotel to remove the column.

The purpose of filing this lawsuit will not be achieved.

Yet the offer seemed irresistible.A simple land replacement can resolve this dispute.If they refused rudely, it would appear that the plaintiff came here to blackmail the hotel.It is indeed the superb level of a barrister.Many people in the auditorium were already overwhelmed by Gu Meimen's demeanor, secretly tsk-tsk their praises, and their attention was completely on Gu Meimen.

At this moment, no one noticed that the lawyer named Beiyuan, who had been carefully reading the land boundary map in the plaintiff's seat, had finished reading the materials since some time. He raised his head with a relaxed expression on his face, Leaning on the seat, enjoying the performance of the Gu Meimen lawyer in front of him with a smile...

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like