The Pastoral Life of a Cultivation Master

Chapter 68 Infrastructure Construction

Chapter 68 Infrastructure Construction
Manager Yu looked at Chen Mo's choice, nodded, and asked again, "Mr. Chen, are you leasing or buying?"

"Buy!" Chen Mo said.

"Okay, tell me, I'll write it down, and after the overall price is calculated, I'll definitely give you a discount! You were introduced by Zhou Gong, don't worry about the price!" Manager Yu said, but Chen Mo just listened to this, and didn't take it seriously. , otherwise it would be a joke.Zhou Gong introduced it. Those who should make money will still make money. He is in sales, not in Shantang.

"It's this kind of combined apartment! In addition, add four more rooms to me." The apartment that Chen Mo chose has a double-row container house on the lower floor, with the width of two containers merged together, and the length of two container houses.

Inside, there are living room, kitchen, dining room, utility room, wet and dry toilet and bath. Upstairs is a single-row container house with a container-width terrace, including two bedrooms, a study, and a bathroom. The upper and lower stairs are on the side, with a canopy. design.

Separately added rooms are the kind of rooms that are in a container, and each room has a bathroom.The space of the room is not bad, and the furniture is fully configured.The container houses that Chen Mo saw were all of the extended type, so the interior space was relatively spacious.

The guest rooms are all one-story structures, which can be placed next to the main apartment and combined with the main room. The top of the guest room can also be expanded into a terrace. At that time, Chen Mo planned to make it into a small garden.Explain your requirements one by one.

The original sales price of the extended container house was about 2.5 yuan, but due to Zhou Gong's introduction, Manager Yu gave a preferential price of 2.2 yuan a piece. In this way, the main building underground 4 and the top two will come with a set. The price of the container house behind the stairs is 13.2 yuan, and the price of two additional guest rooms is 2 yuan, totaling 4.4 yuan.Then all the furniture and decoration totaled 17.6 yuan, for a total of 16 yuan.

Chen Mo thought for a while, and added two lengthened and simple warehouses.But he bought the normal kind.There is still a lack of warehouses in the Qiankun Pearl. After some crops are harvested, there is no place to store them, so I took this opportunity to buy two warehouses.

After the manager calculated the price, he directly subtracted more than 10,000, and reported it to Chen Mo for 35 yuan. The price of the two warehouses is relatively cheap because they are simple.This price also includes the price of the transportation in place and the completion of water and electricity installation.

Finally, after thinking that there is no other need, I nodded. The price is already very favorable, so I paid for it on the spot.This kind of container house is all ready-made, and the selection of furniture and floor decoration is relatively small, only a few, so Chen Mo will directly customize and pay for it, and it will be installed in two days.

In addition, Chen Mo also paid a sum of money for the bottom plate, and spent an extra [-] yuan, mainly on the steel structure of the foundation. This is to ensure the stability of the container, and to prevent moisture and insects, and the entrance and exit of the door can be clean and hygienic, which can prevent Bring dust, etc. into the room, and this foundation is equivalent to the foundation of the skirt around the house.

When we get back to the village, it will be around 2 pm. It is good to have a car, so don't waste time.I went to the construction site to see Uncle Ming's construction. There is no above-ground part of the construction site yet, but the construction waste from the demolition of the old house has been cleaned up, and the foundation of the new house has been dug. In addition, the foundation of the biogas tank is still being excavated. , mainly because the pool is relatively large and cannot be completed in a few days.

The pavement is still being hardened, even if it is covered with gravel, it needs to be hardened if the carts are to walk on it.

When Chen Mo found Chen Ming, he was in charge of the road hardening work, mainly renting a road roller to roll the roadbed back and forth, and then laying the base layer, including the isolation layer, etc.

"Uncle Ming, I have something to do with you!" Chen Mo shouted.

"Er Wazi, you are here!" Chen Ming greeted with a smile.

"Uncle Ming, are your workers still relatively fast in construction? In just a few days, the foundation of the house is almost ready?" Chen Mo said with a smile.

"Hey! It's still slow. If it weren't for your high requirements, the foundation could be dug and built in a day and a half, but you require a deeper foundation to have a basement, so the construction period must be increased at least. More than 10 days." Chen Ming said.

"Haha! Uncle Ming, I came to you today because I wanted you to add a water and electricity pipeline." Chen Mo said.

"What water and electricity pipelines are added?" Uncle Ming asked.

"Then I bought a container house, so I need water and electricity access, or drainage channels." Chen Mo said.

"Oh! Where do you want to put the temporary container house?" Chen Ming did not ask Chen Mo what to buy a temporary house, but asked where to put it.

"There!" Chen Mo said, pointing to the open space across the road from the old house.

Uncle Ming nodded and didn't say much, just motioned to take a look with Chen Mo.

When the two came to this wasteland, Chen Ming said, "Is this still a big place, where do you want to put your house? Facing there?"

"The house still faces south, just backed by the Gourd Valley. The other is the location, probably in this area." Chen Mo pointed to the place not far from the old house, but across the road.

If the container house is placed here, plus the courtyard wall, etc., it will be less than ten meters away from the road.The main reason is that if Chen Mo wants to build Hulu Valley in the future, then the main passage must be set aside, and the passage needs to be larger.

I told Chen Ming about my requirements. The water and electricity are brought in from the convergence point of the old house. If they cross the road, they should be buried in the ground. .The other is to build a drain behind the container house, and then introduce it into the canal through the pipeline. Anyway, after the canal comes out of the gourd valley, although it is not very wide, it is also more than two meters wide, and there is no problem in sewage discharge.

After finishing all the requirements, Chen Ming measured the distance on the spot, and then took out a pen to estimate the cost and labor on the spot.

"Erwa, what you said is simple. It will take two days to complete the construction. The cost is 5000 yuan. The main reason is that the pipeline well needs to be built 1.2 meters, and it needs to meet the needs of people for construction. At least it needs to be completed. A 1-meter square well is built with brick walls one or two thick, and the cost is still relatively high." Chen Ming said.

Chen Mo nodded. He didn't know how much the pipeline well would cost, but before thinking about pulling water and electricity, he checked it online, and it was much higher than Uncle Ming's price, so he agreed with the price.

"Uncle Ming, just follow what you said, the price is as it is. The container house will arrive in a few days, why don't you start construction today!" Chen Mo said.

"Okay! No problem." Chen Ming said, since the price is acceptable by default, there is nothing to say, that is, the matter of dispatching staff.

Chen Mo chatted with Chen Ming for a few more words, and then left.He has other things to do. Uncle Delin asked him to go to the village committee. The contract for Hulu Valley has already been signed. Go and get it. Yesterday, the contract fee went to the town's account, so Uncle Delin also ran for a while. Went to town, signed the contract and took it back.

When I arrived at the village committee, I said hello to Uncle Delin, then checked the contract, and then I accepted the contract with confidence.You can start moving.

"Uncle Delin, the development of Gourd Valley will have to wait. I need to find someone to design it, but the 200 mu of land and the sloping land on the hillside, I want to find a few people to start planting, can you introduce a few to help me? "Chen Mo said.

Uncle Delin pointed to Chen Mo with a smile, but didn't say anything.He knew that this was Chen Mo giving him face, what kind of introduction, it was not that he helped Chen Mo get the contract, and he also made great efforts in it, so Chen Mo wanted to thank himself before asking himself to find workers for him.

You must know that Chen Mo is the one who gets the salary. As long as he works, he can get the salary with guaranteed income during drought and flood.So what Chen Mo said was to give Uncle Delin some favors, let him see if there are any relatives in the family, and recommend a few.This is a human favor, and it is not too small. Anyone who does not have poor relatives can introduce them to work and make money. Those relatives should not be grateful!
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like