Imagine the world

Chapter 91 Preparing for War and Famine for the People

Chapter 91 Preparing for War and Famine for the People

Lei Yunjin didn't mind if the other party poached people face to face.Except for Manman who didn't understand, everyone laughed, and Huazhenxing whispered the meaning to Manman.

Lei Yunjin said with a smile: "I'll talk about digging people when we eat. Let's talk about the plan now. I think Xiao Su's revision suggestions can be considered, and at the same time add a few personal suggestions.

For example, on the roof, I suggest adding a few large water tanks, and pay attention to the structural load-bearing when designing.Its position should be higher than all the buildings in the manor, which is equivalent to a self-weight water tower, through which water can be supplied to the entire manor, and the outside tap water system is connected here first.

The port of Fesso is often without water, and I don't know how the southern waterfront is, but you have a lot of people living there, so you need to design some emergency facilities.For example, emergency diesel generator sets can be placed on the outer sides of two dormitory buildings, and then two independent small houses can be built.

Does the estate have a water cellar?I think there should be one, the dry season is too long in this place, and although there is the Fesso River, the water system is really unreliable..."

Li Xiaoyang replied: "There used to be a dungeon under the rockery in the manor. It can be used as a water storage cellar after reinforcement and renovation."

Lei Yunjin: "How big is the space?"

Li Xiaoyang: "About fifteen by twelve in area, close to four meters in height."

Lei Yunjin: "It can store [-] tons of temporary water, and a simple purification system can be added."

Li Xiaoyang: "Mr. Lei, are your suggestions to prepare for war and famine?"

Lei Yunjin sighed: "Prepare for war, prepare for famine, and serve the people. When I first started working, there were slogans like this on all construction sites... I now feel that it won't be long before I really have to prepare for war."

The reason why Huazhenhang is so anxious to start the plan of Huanxiang Industry and Kelin New Area is because according to the judgment of Old Man Yang and others, by the end of this year at the latest, the famine that is likely to occur in the Feisuo Port area will lead to riots. If the order is out of control, according to In the worst case scenario, the scene 15 years ago may repeat itself.

It seems that Lei Yunjin also has a hunch about the deterioration of the situation in Fesuo Port, but it is only a vague judgment, not as clear and sure as Old Man Yang's deduction.

If this is the case, it is safe to say that all the construction aid workers here should be withdrawn to the country.But these are just Lei Yunjin's guesses, and he can't produce any evidence. Of course, the leaders of the project company can't make such a decision because of this, and even Lei Gong himself can't propose it.

Today, the heavy oil power plant project is at a standstill, but it has not been completely suspended, nor has it explicitly said that it will be cancelled. On the surface, the construction period is only affected by the global epidemic. How can the construction team as the contractor leave as soon as possible.

Moreover, it is very difficult for them to leave if they want to. At this time, they will not be able to buy a plane ticket when they return to Dongguo.There is no local airport in Fesuo Port, and there is only an international airport in Morwang, the capital of Jili. There is only one flight from one airline to Dongguo every week. It is not a direct flight, but a transfer and shared flight.

A while ago, I heard that many people who couldn't buy tickets to Dongguo planned to transfer to Jiliguo to take this flight back. The fares were already very high, and they were all booked in a few months.

Even if you can buy a plane ticket, it is not a wise choice to go to Morwang City to take a plane, because you have to pass through several cities in the south from Port Fesso, it is better to stay in the living area safely.

As soon as we met today, Huazhenxing felt Lei Yunjin's haggard and worry, and now he understood the reason.He took the opportunity to bring the large square plate to the conference table, and Li Xiaoyang also gave the information about the "Barbed Wire Project" to the people opposite.This is the big project they want to talk about today, and there is also an introduction to the agricultural reclamation plan in the materials.

They must explain the project background clearly. If it wasn't for Huanxiang Industrial's own land, who would dare to take the project and go to pull the barbed wire, and they had to explain the function and requirements of the barbed wire before the other party could make specific designs.

Taking advantage of the time the other party was looking at the information, Hua Zhenxing probed his head and said, "Mr. Lei, are you worried that the situation in Fesuo Port will worsen, and the engineering team is stuck here, can't leave and has nothing to do? Then this project You should take a closer look. It is a large-scale agricultural reclamation project. If it goes well, the food supply can be stabilized after this autumn..."

Lei Yunjin asked while looking at the information: "Is it mainly a high-yield crop cassava? But this thing is not resistant to storage, and it is very troublesome to process."

Li Xiaoyang: "Huanxiang Industry has a supporting food processing plant. It is not written in this document. It can be completed before the harvest season, which can ensure the processing and storage capacity."

Huazhenxing added: "This project can be completed by you independently, with special funds for special personnel, no contact with other personnel, and absolute safety."

Lei Yunjin put down the documents and looked up, "What is this box for?"

Huazhenxing: "High-tech laser holographic sand table, is there any power supply here?"

Lei Yunjin: "Of course! Xiao Su, get them a power strip and pull them over."

After the power is turned on, the sand table shows the whole picture of the "Beisuo River Basin Reconstruction and Agricultural Reclamation Project". Li Xiaoyang explained it against the sand table.

The more Lei Yunjin listened, the more interested he became. He had already stood up with his hands on the table, and looked down carefully and said, "This is more than one project! The first step is the three-layer stepped shallow dam in the middle and lower reaches, which blocks the flow of water, stores water, and manufactures wetlands.

The second step is to take straight bends in these three places, and divert to slow the flow.The most important project is the third step, the construction of the upstream reservoir...I understand why you are pulling the barbed wire now. "

Li Xiaoyang: "Yes, we must take protective measures in advance. There are nine small circles on the sand table and an overall large circle on the outside. The small circle is a modern farm, and there are many places in the large circle that are the dispersal areas after the heavy rainy season. "We have to guard against not only wild animals, but also local people, otherwise a large area of ​​crops can be ruined overnight."

Lei Yunjin: "I can also see that the document requires a Y-shaped gillnet grille, which is usually used in airports and is also the specification of border barbed wire. There is no need to use this kind of anti-elephant, and wild animals are fine. You will slam on obstacles like this, mainly to prevent people, right?"

Hua Zhenxing interjected, "You're right, can you estimate the total project budget?"

Lei Yunjin frowned and said, "It still needs to be combined with the field investigation to design a plan, and then ask the budget staff to make a special quotation. But I can give you a rough reference. This kind of barbed wire grid is not available in Feisuo Port." The CIF price of the produced ones shipped from the east country, if customs duties are not included, is probably 200 yuan per extended meter. I have done similar projects two years ago."

Hua Zhen did some calculations in his head and surprised himself: "200 yuan per extension meter, the total project volume is 310 kilometers, wouldn't the cost be 6000 and [-] million?"

Lei Yunjin smiled and said, "You're right, but this is just the cost of materials and engineering costs. Our engineering team can't work in vain."

Li Xiaoyang: "So how much is the project cost?"

Lei Yunjin: "Usually, the quotation is based on the difficulty of construction. It is good to say that on the plain, there is still a large mountain on your sand table, and now there is no construction road."

Li Xiaoyang: "Haven't you done the same project, you always have an approximate number in your mind?"

Lei Yunjin shook his head: "The situation is different. For example, building an airport is a general contract project. I can give away all the work like barbed wire without charging for the project separately. But this project of yours is to repair barbed wire. , I can't report the exact figure right now, but the total price is estimated to be about [-] million."

Hua Zhenxing: "Mi Jin?"

Lei Yunjin laughed out loud: "How can it be so exaggerated, what I just said was Dongguo currency."

Even a Yidong national currency is too exaggerated, far exceeding Hua Zhenxing's expectations.The purchase of the 300 million square kilometers of land, together with the initial expenses for the establishment of Huanxiang Industry and Feisuogang Supply and Marketing Cooperative, cost a total of 1000 million rice gold, which is equivalent to about 7000 million Dongguo currency.

Engineer Ye Yuhong also stood up and said: "Do you think the cost is too high? I think so too. How does your design plan feel like a child came up with his forehead?"

Li Xiaoyang was embarrassed to continue, because this plan is really a child's brain hole, similar to "adding railings to the Yellow River", but it is not just whimsical!But the kid who slapped his forehead was sitting next to him. At first, the three old men didn't say anything, and he didn't say much.

Hua Zhenxing widened his eyes and said innocently, "Ye Gong, what advice do you have?"

Ye Yuhong pointed to the sand table and said, "I have also done this kind of project. There are such grilles or gill nets around the periphery of many power facilities to prevent people from accidentally entering and causing danger. Different requirements have different specifications.

The reason for using such a high-standard border gill net is mainly to prevent people from climbing over it on a large scale.Then we first look at where the people who need to be guarded are located. Are there any in the north or in the west?There is no one living in the north at all, and the west is in the mountains.

So you just need to build a border gill net along the red line of the land in the south, from the eastern beach to the western foot of the mountain, according to the mark on this sand table, about [-] kilometers is enough.

If you take a closer look, the residents of Fiso Port mainly live in this area. Even if you want to bypass the barbed wire to enter this area, you have to walk more than 20 kilometers, and then walk another [-] kilometers to reach the distribution center. The farm area is [-] kilometers round and round.

Who would run [-] kilometers to steal a few cassava, and have to walk over mountains and mountains in the middle. Even if someone did this, the thing would not be edible without taking it back for processing. I am afraid it will be broken halfway? "

Hua Zhenxing put up his thumb and said: "You are right! The material cost of the 800 kilometers of barbed wire grid is only 270 million. The focus is on this section first. But there are still [-] kilometers left, you have What advice?"

Ye Yuhong: "If you all really want to repair it, you can use ordinary two-meter-high grilles for the rest of the place. You can pull a barbed wire and tie it to the top grille. The project is very simple. If only the cost of materials is counted, every meter of extension will be fine. It's only about 50 yuan."

Hua Zhenxing said: "If you save 270 yuan per meter, you can save 50 million yuan for [-] kilometers."

Lei Yunjin laughed again, pointed to the reservoir area planned in the upper and middle reaches of the sand table, and said, "You can count quite fast! But you can save more cost. This grille is in the mountain, even if the material cost is not expensive, It is the most expensive part of the project.

Now that the reservoir has not been repaired, it is not necessary to erect a grille in the mountain alone, and the [-] kilometers will not be used for the time being.If we really want to build a reservoir in the future, and we are responsible for the construction, this easy little work can be given away for nothing. "

Hua Zhenxing nodded and said, "You're right. The 50 kilometers can be left unrepaired. Calculated at 300 yuan per meter, it will save another [-] million yuan."

Lei Yunjin: "This saves not only the material cost, but also the biggest construction cost. The remaining grilles only need to be repaired on the plain wasteland, which saves a lot of trouble."

Ye Yuhong took out his mobile phone as a calculator and said, "I checked it, and according to Mr. Lei's suggestion combined with the plan just now, the cost of materials is 850 million, plus the construction cost, the total project cost is about 3000 million. , can fully meet your requirements.”

Hua Zhenxing: "Thank you so much, I really learned today! I saved 7000 million Dongguo coins in one fell swoop, which is equivalent to 1000 million rice gold!"

Ye Yuhong amused him: "Thank you for what we are doing, this is a matter of common sense, and the project should be designed this way."

For Ye Yuhong, this is indeed the simplest common sense.But for Hua Zhenxing, who has been eager to learn since childhood, he really didn't understand it.

Hua Zhenxing didn't understand until this moment why several old men sent him the task to come here to talk about the project.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like